My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 07212001
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2001
>
PL PACKET 07212001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:38:58 PM
Creation date
12/30/2015 7:38:34 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 07212001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
relative to abatement of only friable asbestos. Friable asbestos-containing material such as spray-on <br /> . thermal insulation and ceiling texture and pipe insulation must be abated prior to demolition and <br /> renovation. <br /> Review of the asbestos survey reports supplied to Wenck indicates the possibility of additional <br /> asbestos-containing materials within the plaza that are not evaluated or quantified in the reports. <br /> Wenck recommends prior to demolition/renovation, a pre-demolition survey (i.e., one employing <br /> destructive evaluation methods) be conducted to determine the ACM remaining in the plaza using <br /> ■ the existing survey reports, and to determine if materials used in construction or as replacement of <br /> abated ACM since 1994 are asbestos-containing. We would anticipate that a pre-demolition survey <br /> to ensure that sufficient documentation exists to direct pre-demolition abatement activities would <br /> cost approximately $8,000 to $10,000. <br /> ■ If either partial or complete renovation is contemplated,ACM remaining in the plaza can be <br /> managed in place using an operation and maintenance plan (O&M Plan) prepared in accordance <br /> with the Minnesota Department of Health regulations. ACM that is readily accessible or has a high <br /> potential for becoming a hazard should be abated. An O&M Plan would cost approximately $1000 <br /> ■ to develop. <br /> ACM Abatement Cost Estimate <br /> This estimate is based on the asbestos containing materials and quantities listed in the Report. <br /> ■ Demolition <br /> Abatement of friable and non-friable asbestos-containing material prior to demolition: <br /> 1. 2" — 6" pipe and pipe fitting insulation.................................................$350,000 <br /> 2. 6" — 12" pipe and pipe fitting insulation.................................................$50,000 <br /> 3. 9" and 12" floor file and mastic.............................................................$845,000 <br /> 4. Spray-on fire proofing (bowling alley) .................................................$100,000 <br /> 5. Spray-on ceiling texture ............................................................................$50,000 <br /> i 6. 2' x 4' ceiling panels .....................................................................................$4,000 <br /> 7. Boiler gasket .................................................................................................$1,000 <br /> 8. Demolition debris piles ...........................................................................$100,00 0 <br /> Total ..............................................................$1,500,000 <br /> Abatement of friable asbestos-containing material only prior to demolition: <br /> 1. 2" — 6" pipe and pipe fitting insulation.................................................$350,000 <br /> ■ 2. 6" — 12" pipe and pipe fitting insulation ...............................................$50,000 <br /> 3. Spray-on fire proofing (bowling alley) .................................................$100,000 <br /> ■ 4. Spray-on ceiling texture ............................................................................$50,000 <br /> 5. 2' x 4' ceiling panels ....................................................................................$4,000 <br /> 6. Boiler gasket .................................................................................................$1,000 <br /> 7. Demolition debris piles ..........................................................................$100.00 0 <br /> Total $655,000 <br /> Following are abatement unit price costs of materials that were used to develop the estimates: <br /> ■ 2" — 6" pipe insulation ................................................................................$18/ft <br /> 2" — 6" pipe fitting insulation ...................................................................$40/ea <br /> ■ 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.