Laserfiche WebLink
Historical Consultants <br />lip The Foster House <br /> 100 North First Street <br /> Minneapolis MN 55401 <br /> December 13, 2004 . 612 338-1987 phone <br /> 612 338-2668 fax <br /> ww.w.hessroise.com <br /> Kim Moore-Sykes Hess .Ro i 5 e <br /> Saint Anthony Village <br /> 3301 Silver Lake Road <br /> Saint Anthony, Minnesota 55418 <br /> Dear Ms. Moore-Sykes: <br /> Thank you for contacting us about the building at Sunset Memorial Park. Some <br /> background information on Hess Roise is enclosed. As I mentioned, I have a <br /> personal interest in cemetery and landscape history, and our office recently <br /> nominated the Minneapolis Pioneers and Soldiers Memorial Cemetery at Cedar <br /> Avenue South and Lake Street to the National Register of Historic Places. <br /> Working with architects MacDonald and Mack, we have completed historic <br /> structures reports for Lawnfield (President Garfield's estate in Mentor, Ohio, for <br /> the National Park Service) and a variety of other properties. <br /> We propose a two-phase evaluation process, with MacDonald and Mack as <br /> subcontractors to Hess Roise: <br /> Phase 1 <br /> Hess Roise and MacDonald and Mack will do a preliminary examination of the <br /> building. We will record our observations with field notes and digital <br /> photographs. In addition, Hess Roise will conduct a brief literature search to <br /> explore the historical significance of the property. <br /> Based on this work, we will prepare a report summarizing our preliminary <br /> findings. The report will indicate: <br /> • Whether the property appears to be historically significant and has <br /> potential for listing in the National Register of Historic Places; <br /> • If so,under what criteria, and what additional research is needed to <br /> verify the preliminary finding; <br /> • A basic analysis of the building's structural condition and the <br /> feasibility of renovating it; and <br /> • What additional studies are required to develop a renovation plan. <br /> Phase 2 <br /> This phase would carry out the additional work outlined in the Phase 1 report. <br />