Laserfiche WebLink
• PAGE TWO <br /> ST. ANTHONY HIGH SCHOOL - COST ESTIMATE <br /> UPPER LEVEL UNITS COST/UNIT <br /> RECREATION <br /> General <br /> 1. Demo Walls 16 50 800 <br /> 2. Remove CPT (a Portion) 200 <br /> 3. Patch Wall/Floor/Ceiling 500 <br /> 1500 <br /> Mechanical <br /> 1 . Combine Stats , Adjust O.A. <br /> Controls . <br /> Cost Estimate 250 <br /> Electrical <br /> 1 . Clean and relamp light <br /> fixtures . <br /> 2. Install wine guards on all <br /> • light fixtures. <br /> 3. Remove receptacles mounted <br /> on wall to be demolished. <br /> Cost Estimate 850 <br /> SENOIR CITIZENS <br /> General <br /> 1. Remove Biology Casework 8 Units 1.00 800 <br /> 2. Install Wood Panels @ <br /> Removed Casework 8 .50 400 <br /> 3. Install New Carpet 130 Yd. 19 2400 <br /> 3600 <br /> Mechanical <br /> 1. Disconnect (7) sinks waste, <br /> vent , water b gas. <br /> 2. Disconnect plumbing to <br /> teachers station. <br /> 3. Adjust O.A. and exhaust CFM. <br /> Cost Estimate 1200 <br /> Electrical <br /> 1. Clean and relamp light fixtures. <br /> • 2. Remove one duplex receptacle from <br /> each of 5 lab benches. <br /> 3. Remove receptacles and volt <br /> controller from main lab bench. Cut <br /> off and cap conduit at floor line. <br /> Cost Estimate 750 <br />