My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08111987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 08111987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:23:14 PM
Creation date
12/30/2015 4:22:58 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 08111987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• PAGE THREE <br /> ST. ANTHONY HIGH SCHOOL - COST ESTIMATE <br /> UPPER LEVEL UNITS COST/UNIT. <br /> OFFICE AREA <br /> General <br /> 1. Cased Opening (patch) 41 -0"0' -0" 500 <br /> 2. New Wall /Paint 160 sq.ft. 3.50 600 <br /> 3. New Door 2 500 1000 <br /> 2100 <br /> (No mechanical ) 0 <br /> (No electrical ) 0 <br /> CORRIDOR <br /> General <br /> 1. New Locks @ Stairs 2 150 300 <br /> (No Mechanical ) <br /> • Electrical <br /> 1. Install one exit sign. <br /> 2. Install magnetic door holds. <br /> Cost Estimate 700 <br /> LOWER LEVEL <br /> DAYCARE 1 <br /> General <br /> 1. Demo Partition 10 hr. 50 300 <br /> 2. Remove Floor Tile 1120 sq.ft . 1 .00 1200 <br /> 3. Remove Ceiling 1120 sq.ft . .50 600 <br /> 4. New Floor (Carpet) 130 Yd. 18.00 2340 <br /> 5. New Lay-In Ceiling 1120 sq.ft. 1 .25 1400 <br /> 6. Paint Walls 1300 sq.ft. .. .60 800 <br /> 7. Bathroom Walls (drywall ) 250 sq.ft. 3.00 750 <br /> 8. Bathroom Floor (s .vin.) 40 sq.ft . 2.00 80 <br /> 9. Door/Window 1 500 500 <br /> 10. Paint 200 <br /> 11. Patch wall @ Lay. 300 <br /> 12. Toilet ACC 200 <br /> 8670 <br />
The URL can be used to link to this page
Your browser does not support the video tag.