My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08111987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 08111987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:23:14 PM
Creation date
12/30/2015 4:22:58 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 08111987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE FOUR <br /> ST. ANTHONY -HIGH SCHOOL - COST- ESTIMATE <br /> LOWER LEVEL UNITS COST/UNIT <br /> DAY CARE 1 (Continued) <br /> Mechanical <br /> I. Add (3) plumbing fixtures. <br /> 2. Provide waste, vent , water <br /> piping & insulation. <br /> 3. Provide toilet exhaust system. <br /> 4. Revise/combine controls. <br /> 5. Provide heat in toilet room. <br /> 6. Cutting and patching. <br /> Cost Estimate 6100 <br /> Electrical <br /> 1. Add- one toilet room. <br /> 2. Remove existing light <br /> fixtures, clean , relamp and <br /> reinstall on new lay-in ceiling. <br /> . 3. Remove approximately 15' of <br /> • wiremold. <br /> 4. Disconnect and remove 2 bench <br /> grinders and one parts washer. <br /> Cost Estimate 1300 <br /> DAYCARE 2 <br /> General <br /> 1. New Bathroom <br /> (same as d.c.l. ) 2000 <br /> 2. Patch wood cabinets <br /> @ Bathroom 1 300 <br /> 3. Patch Paint 200 <br /> 2500 <br /> Mechanical <br /> 1. Add (3) plumbing fixtures ., <br /> 2. Provide waste , vent, water <br /> piping and insulation. <br /> 3. Provide toilet exhaust_ . <br /> 4. Cutting and patching. <br /> 5. Remove existing supply and <br /> exhaust fans . <br /> • Cost Estimate 8700 <br /> �J <br />
The URL can be used to link to this page
Your browser does not support the video tag.