Laserfiche WebLink
PAGE SIX <br /> ST. ANTHONY HIGH- SCHOOL - COST.ESTIMATE <br /> LOWER LEVEL UNITS COST/UNIT <br /> PRESCHOOL <br /> General <br /> 1. New Toilet (same as others) 2000 <br /> 2. Demo Partition 250 <br /> 3. Patch Cabinets 200 <br /> Mechanical 2450 <br /> 1. Add (3) plumbing fixtures. <br /> 2. Provide waste, vent , water piping <br /> and insulation. <br /> 3. Provide toilet exhaust system. <br /> 4. Provide heat in toilet room. <br /> 5. Remove (3) sinks and cap piping. <br /> 6. Remove spray booth exhaust. <br /> 7. Cutting and patching. <br /> Cost Estimate 6600 <br /> • Electrical <br /> 1. Clean and relamp light fixtures. <br /> 2. Add one toilet room (same as in <br /> daycare) .. <br /> 3. Disconnect and remove exhaust hood. <br /> Cost Estimate 675 <br /> DAYCARE 3 <br /> General <br /> 1. Demo Wall 8 50 400 <br /> 2. New Toilet . 2000 . <br /> 3. Patch Floor/Wall/Ceiling 500 <br /> Mechanical 2900 <br /> 1. Remove (3) sinks - cap piping. <br /> 2. Remove spray booth exhaust. <br /> 3. Add (3) plumbing fixtures. <br /> 4. Provide waste, vent , water <br /> piping and insulation. <br /> 5. Provide toilet exhaust. <br /> 6. Cutting and patching. <br /> Cost Estimate 7600 <br /> Electrical <br /> 1. Clean and relamp light fixtures. <br /> 2. Add one toilet room. <br /> Cost Estimate 1400 <br />