Laserfiche WebLink
PAGE .SEVEN <br /> • ST. ANTHONY HIGH SCHOOL =--COST ESTIMATE <br /> LONER LEVEL UNITS COST/UNIT <br /> KITCHEN <br /> General <br /> 1. Q.T.Floor 400 sq.ft. 5.00 2000 <br /> 2. New Ceiling 400 sq.ft. 1.50 600 <br /> 3. New C.T. Walls 600 sq.ft. 4.00 2400 <br /> 4. Service Counter 500 <br /> 5. Dishwasher/booster <br /> heater/counter 3000 <br /> 6. 3 Comp. Sink 600 <br /> 9100 <br /> Mechanical <br /> 1. Make connections to 3 <br /> compartment sink. <br /> 2. Make connections to <br /> dishwasher. <br /> 3. Make connection to <br /> disposal . <br /> 4. Add dishwasher exhaust . <br /> 5. Relocate stat. <br /> 6. Provide waste, vent , water <br /> piping and insulation. <br /> 7. Cutting and patching. <br /> Cost Estimate 5400 <br /> Electrical <br /> 1. Clean and relamp light fixtures . <br /> 2. Install new light switch for <br /> control of kitchen lights. <br /> 3. Add 6 new duplex receptacles. <br /> 4. Connect new dishwasher. <br /> 5. Connect new exhaust fan. <br /> 6. Connect new booster heater. <br /> 7. Remove existing light fixtures <br /> in way of new wall . <br /> Cost Estimate 1600 <br /> LOWER LEVEL CORRIDOR <br /> Electrical Cost Estimate 550 <br />