Laserfiche WebLink
PAGE ELEVEN <br /> ® ST. ANTHONY HIGH SCHOOL - COST ESTIMATE <br /> LOWER LEVEL UNITS COST/UNIT <br /> S14ALL ENGINES <br /> General <br /> 1. Cut Opening for Door & <br /> Lintel 1000 <br /> 2. Demo Wall 16 50.00 800 <br /> 3. New Door/Frame 500 <br /> 4. Patch Wall/Floor/Ceiling 500 <br /> 5. Relocate Equipment 2 1.50 300 <br /> 6. Sound Absorbing Panels/Clg. <br /> 2000 <br /> 5100 <br /> Mechanical <br /> 1 . Install existing exhaust system. <br /> 2. Install existing make-up air <br /> system. <br /> 3. Relocate return pipe in partition . <br /> 4. Add radiation caps. <br /> 5. Remove radiation and revise for <br /> new door. <br /> 6. Combine stats. <br /> 7. Add general exhaust system. <br /> 8. Reduce existing supply air to 75% <br /> of gen. exh. <br /> Cost Estimate 8200 <br /> Electrical <br /> 1. Remove 2 duplex receptacles, <br /> 1 J-box and 1 projector outlet <br /> from wall to be demolished. <br /> 2. Provide (2) new stop/start push <br /> buttons for exhaust system and <br /> make-up air. <br /> 3. Provide new connection to relocated <br /> exhaust fan and make-up air fan. <br /> 4. Provide dedicated duplex receptacle <br /> for relocated parts washer. <br /> 5. Install 30' of MOA 2000 on wall . <br /> 6. Connect 2 relocated 1/3 HP bench <br /> grinders. <br /> ® 7. Connect new supply unit on roof.- <br /> Cost Estimate 3000 <br />