My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08111987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 08111987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:23:14 PM
Creation date
12/30/2015 4:22:58 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 08111987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAGE TWELVE <br /> ST. ANTHONY HIGH SCHOOL - COST- ESTIMATE <br /> LOWER LEVEL UNITS COST/UNIT <br /> EXTERIOR <br /> General <br /> 1. New Parking Lot -60 Cars- <br /> (65 x 200) 1860 sq.yd. 14.00 26000 <br /> 2. Improve Driveway 170' sq.yd. 14.00 .2400 <br /> 3. New Sidewalk to Small <br /> Engine Room 600 sq.ft. 2.00 1200 <br /> 4. New Play Lot @ N. Side 10000 <br /> 5. Electrical Service Relocation (Not Included) <br /> 6. Curbs 5000 <br /> 44600 <br /> Electrical <br /> 1. Install 2 light standard parking <br /> lot light fixtures with photo cell <br /> and time clock controller. <br /> Cost Estimate 5000 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.