Laserfiche WebLink
ai0.a thon <br /> .1 <br /> a OVAL : <br /> DATE : A P <br /> March 10 , 1989 \ <br /> Mayor and Councilmembers <br /> FROM : Larry Hamer, Public Works Director <br /> 2 TEM : PULL/REPAIR WELL #5 PUMP <br /> Three bids were received for the pulling and repair of the Well #5 pump. <br /> The pump was last checked in 1981. At that time the following parts <br /> were replaced: <br /> •21 bearings <br /> •5 column pipes <br /> •4 steel shafts <br /> •1 constrainer <br /> •1 suction pipe <br /> -Repairs to the bowl <br /> The bids were very close and I elected to extend the cost on each bid <br /> to cover all parts in the pump, and the time to pull and reinstall the <br /> pump. <br /> According to the 1981 replacement, the repairs should be considerably <br /> less than the -extension to determine the low bid. It is difficult to <br /> get a true and accurate cost until the pump is pulled. <br /> Recommend the bid be awarded to the lowest bidder, E. H. Renner & Son, <br /> for the repair to the Well #5 pump. <br /> :cjk3. 28 .89 <br />