My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03281989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 03281989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:35:43 PM
Creation date
12/30/2015 4:35:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 03281989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. 1 <br /> -2- <br /> 5. Bowl - 12 m.c. , 8 stage <br /> 6. Suction - 8 inch, 10 feet of pipe <br /> 7. Cone strainer - 8 inch <br /> 8. Pump head - Layne Bowler <br /> 9. Gear drive - Amarillo, model B5L, used as a supplementary <br /> power source <br /> Description of Well 15 <br /> 1. Casing size - 20 X 16 <br /> 2. Well depth - 475 feet <br /> 3. Static level - 133 feet <br /> Bid Items <br /> 1. Furnish all necessary equipment and labor to pull the pumps • <br /> and reinstall the pump. <br /> $.125.00 per -hourij�7� <br /> Furnish amount of time to remove: 82 hours <br /> Amount of installation time: 102 hours <br /> Number of men: 2 <br /> 2. Furnish hourly rate for shopman to make possible repair. <br /> S 35.00 per hour <br /> 3. Furnish hourly rate to remove possible fill from well. <br /> Number of men: . 2 <br /> Labor per hour: $ 100.00 <br /> Equipment per hour: $ 25.00 <br /> 4. Furnish hourly rate for possible test pumping. <br /> Number of men: 2 <br /> Labor per hour: $ <br /> Equipment per hour: $ 25.00 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.