My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12131994
StAnthony
>
City Council
>
City Council Packets
>
1994
>
CC PACKET 12131994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:23:08 PM
Creation date
12/30/2015 6:22:53 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 12131994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of such Drawings shall be continued by the Architect until they meet with the <br /> approval of the City and of all agencies of the State of Minnesota and other <br /> governmental agencies having jurisdiction over the Project, from which approval is <br /> mandatory according to law. The Architect shall not proceed with the preparation <br /> of construction Drawings until the Design Development Drawings unless and until <br /> the estimates of cost have been approved in writing by the City and the Project <br /> released by the City for preparation of construction Drawings. It is understood that <br /> the Architect does not guarantee the accuracy of the estimates of cost. <br /> 3.4 CONSTRUCTION DOCUMENTS PHASE <br /> 3.4.1 The Architect shall prepare from the approved Design Development <br /> Documents, working Drawings and Specifications setting forth in detail the Work <br /> required for the architectural, structural, mechanical, electrical, service-connected <br /> equipment and Site Work, and the necessary bidding information, General <br /> Conditions, Supplementary General Conditions, and Special Conditions of the <br /> Contract. <br /> 3.4.2 Before the Construction Documents are complete the Architect shall have <br /> prepared a detailed analysis of Probable Project Construction Cost establishing unit <br /> costs estimates of various components of the Project. The Architect shall keep the <br /> City informed, in writing, of any adjustments to previous Statements of Probable <br /> Project Construction Cost indicated by changes in scope, requirements or market <br /> conditions, and shall furnish the City a revised estimate of construction costs upon <br /> completion of Construction Documents. <br /> 3.4.3 The Drawings and Specifications shall be prepared by the Architect in <br /> accordance with the local building ordinances and the regulations of the authorities <br /> of the State of Minnesota having jurisdiction. The Architect shall submit all <br /> Drawings and Specifications to all public authorities having jurisdiction and shall <br /> obtain their approval. <br /> 3.4.4 The Architect shall prepare plans, Specifications and Contract Documents in <br /> such form that independent bids may be obtained for mechanical, electrical or other <br /> normally separable parts of the Project, in the discretion of the City. <br /> 3.4.5 The Architect agrees to include provisions for alternate bids so as to meet the <br /> specified cost limit or to revise plans and Specifications to meet the cost at no <br /> additional fees to the City, provided bids are taken within 2 months of the date of <br /> the Architect's final estimates. <br /> 3.4.6 During the course of construction, Architect shall cooperate with the City and <br /> Contractor in preparation of marked-up prints, "as-built" Drawings and other data <br /> necessary for documentation of changes in Work. <br /> -5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.