Laserfiche WebLink
with the Contract Documents. If a Project Representative is provided, the Architect <br /> will prepare and deliver to the City on a weekly basis reports of the daily <br /> observations of the Project Representative. <br /> 4.5 The Architect shall furnish to the City, at the City's expense, a complete set of <br /> reproducible prints of completed working Drawings reproduced on approved <br /> material, and a copy of the structural calculations. <br /> 4.6 The Architect, at its expense, shall furnish Drawings and Specifications required <br /> by public agencies having jurisdiction, and shall furnish the City triplicate sets of <br /> Drawings and Specifications at each phase of design for the City's review and <br /> approval. Reproduction costs for bidding purposes shall be reimbursed to the <br /> Architect by the City. The number of Drawings and Specifications reproduced for <br /> bidding purposes shall be determined by the Architect and the City. <br /> 4.7 The Architect agrees to cooperate with the City.up to the expiration of the <br /> guarantee periods as set forth in the Specifications and to.inspect without additional <br /> cost to the City, work of the Contractor(s) in fulfillment of said guarantees. <br /> 4.8 No such Additional Services shall be commenced by Architect without an <br /> estimate of the cost thereof by the Architect and the City's prior written <br /> authorization to proceed. <br /> ARTICLE 5. THE OWNER'S RESPONSIBILITIES. <br /> 5.1 The City shall provide full information as to its requirements for the Project. <br /> 5.2 The City will appoint an individual to be the City's representative at the Site <br /> (the "City Representative"). The Architect and its consultants shall work <br /> cooperatively with the City Representative and his inspectors to facilitate the <br /> implementation of the City's participation in, and inspection of, the Project. The <br /> City will be actively involved in the Project. Contractor's submittals such as Shop <br /> Drawings, Product Data and Samples shall be routinely routed through the City <br /> Representative for concurrence before the Architect returns them to the Contractor. <br /> Such submittals without the City's Stamp of Approval.shall be invalid. The <br /> Architect may ask the City Representative for verbal approval of routine submittals. <br /> Such verbal approval is valid only when backed by follow-up written approval. The <br /> Architect and its consultants shall make themselves available to the City <br /> Representative so that a timely resolution of possible deficiencies can be effected <br /> with a minimum of disruption to the Project. The City Representative has the <br /> authority to ask the Architect to reject Work which does not conform to the <br /> Contract Documents. If the Architect chooses not to honor such request, it shall <br /> -10- <br />