My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12131994
StAnthony
>
City Council
>
City Council Packets
>
1994
>
CC PACKET 12131994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:23:08 PM
Creation date
12/30/2015 6:22:53 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 12131994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department of Public Works <br /> s=. Paul L. Kirhvold,P.E., Director and County Engineer <br /> ENGINEERING/OPER4TlONS <br /> ADMINISTR4TION/LM'D SURVEY 3377 N.Rice Street <br /> t, 50 West Kellogg Blvd.,Suite 910 Shoreiiew.MN 55126 <br /> RAMSEY COUMY St. Paul,MN 55102 0 (612)266.2600 o Fax 266-2615 (612)454-9104 Fax 482-5232 <br /> October 26, 1994 <br /> Mr. Larry Hamer <br /> City of Saint Anthony <br /> 3301 Silver Lake Road <br /> Saint Anthony, Minnesota 55418 <br /> Dear .Mr. Hamer: <br /> The Ramsey County Public Works Department, in cooperation <br /> with Hennepin County and the Cities of Saint Anthony and New <br /> Brighton, is proposing traffic signal modifications and <br /> interconnect for the traffic signals on Silver Lake Road at <br /> 37th Avenue (County Road D) , 39th Avenue and Palmer Drive. <br /> This work is proposed to be done concurrently with the Ramsey <br /> County reconstruction project on Silver Lake Road from Silver <br /> Lane to I-694 . Upon completion of both projects the traffic <br /> signals will be interconnected and coordinated along Silver <br /> Lake Road from 37th Avenue to Palmer Drive. <br /> The traffic signal at Silver Lake Road and 37th Avenue <br /> (County Road D) is proposed to be modified to include split <br /> phasing on 37th Avenue. The estimated cost of this <br /> modification is $9,500.00. The City of Saint Anthony's share <br /> As 25% of the cost based on entering legs as per the Ramsey <br /> County Cost Participation Policy. <br /> The traffic signal at 39th Avenue is ' proposed to be <br /> reconstructed. The existing equipment is in need of <br /> replacement. • The new traffic signal will include <br /> protected/permissive left turn operation for the north/south <br /> left turns. The estimated cost of this reconstruction is <br /> $79, 200.00. The City of Saint Anthony's share is 50% of the <br /> cost based on entering legs as per the Ramsey County Cost <br /> Participation Policy. The interconnect costs will be paid for <br /> 100% by Ramsey County. <br /> The proposed costs will be eligible for State-Aid funding. If <br /> Saint Anthony wishes to use MSA funds on 37th Avenue we will <br /> add the appropriate number to the plans. <br /> Minnacnta'a Pirat 17nmi%RnIn Cminfv <br />
The URL can be used to link to this page
Your browser does not support the video tag.