Laserfiche WebLink
Mr. Mike Mornson <br /> St. Anthony, MN <br /> July 14, 1998 ' <br /> Page 4 <br /> connections. With the revisions recommended in this letter, we would expect the Feasibility <br /> Study to cost about $25,000,and the modified I/I reduction program to cost approximately <br /> $20,000. The remaining funds that have been allocated to this project,approximately.$40,000 <br /> could be allocated to the"incentive"program to assist homeowners in correction of the problem. <br /> The City may incur additional costs with this approach through the increased Staff time required <br /> to provide the "technical guidance" for individual homeowners making modifications, and <br /> conducting the required inspection at the time of property transfer. <br /> In summary, because we expect the proposed sump pump inspection program as currently <br /> proposed,may not be able to produce the intended result of significantly lowering the I/I within <br /> the system. We recommend the approach be modified to include a long term program of <br /> reducing I/I, and a short term program of increasing sanitary sewer conveyance capacity to <br /> reduce backups. <br /> If you have any questions or need additional information,please let us know. <br /> Sincerely, <br /> WSB &Associates,Inc. <br /> Charles�Rha ski,P.E. <br /> Project Ma <br /> c: Mr. Pete Willenbring,WSB <br /> Mr. Todd Hubmer,WSB <br /> CJ/sm <br /> FAWPW N\1065.14\07159&mm.wpd <br />