My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 09081998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:40:31 PM
Creation date
12/30/2015 6:40:18 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09081998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' 2.4 Project Location <br /> The project is located in the south central portion of the City of St. Anthony and <br /> includes the following streets: <br /> • Wilson Street from 29'Avenue Northeast to 27`h Avenue Northeast <br /> • Pahl Avenue from Wilson Street to Coolidge Street <br /> ' Alleys from Wilson Street to Coolidge Street, north and south of Pahl <br /> Avenue and south of Murray Avenue <br /> The project area is identified on Figure 1 in Appendix A of this report. <br /> 2.5 Project History <br /> This project was initiated through the recognition of the following conditions in the <br /> project area: <br /> 1 • Deterioration of street conditions <br /> • Reoccurring street flooding and inundation of homes from storm water <br /> • The lack of capacity in the sanitary sewer system which results in frequent <br /> back-up of the sanitary line into tributary homes <br /> • The streets, sanitary sewer, water main lines are approximately 40 years old <br /> and are exhibiting deterioration problems <br /> As a result of City Staff recommendations, storm water management task force <br /> ' recommendations, engineering analysis of selected flood problem areas within the <br /> City of St. Anthony recommendations, and preliminary recommendations from the <br /> Sanitary Sewer Feasibility Study; the City Council provided funding in the 1999 <br /> budget for street and utility improvements. In addition, funding was also provided <br /> from the Federal Emergency Management Association and the Minnesota <br /> Department of Natural Resources to complete improvements within the project area. <br /> ' On July 28, 1998 the St. Anthony City Council authorized the preparation of an <br /> engineering feasibility report for the 1999 Street and Utility Improvement Project. <br /> ' The project includes the construction of storm water basins to handle storm flows <br /> which currently inundate structures and floods streets in excess of two feet in the <br /> project area. Continuing inundation of streets has lead to the deterioration.of catch <br /> basins and pavements within the project area. <br /> 1 <br /> 1 <br /> ' City of St.Anthony-1999 Street&Utility Improvement Project <br /> Feasibility Report A <br /> 1 WSB Project No.1065.21 WSB <br /> ems- <br /> Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.