My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081998
StAnthony
>
City Council
>
City Council Packets
>
1998
>
CC PACKET 09081998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:40:31 PM
Creation date
12/30/2015 6:40:18 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09081998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. INTRODUCTION <br /> 2.1 Authorization <br /> On July 28, 1998 the City of St.Anthony City Council authorized the preparation of <br /> an engineering Feasibility Report for the 1999 Street and Utility Improvement <br /> Project. This project was authorized under City of St. Anthony Resolution 98-064. <br /> 2.2 Scope <br /> This project provides for the street and utility reconstruction on Wilson Street from <br /> 27`h Avenue to 29' Avenue, Pahl Avenue from Wilson Street to Coolidge Street, <br /> alley from Wilson Street to Coolidge Street north of St. Anthony Boulevard, alley <br /> from Wilson Street to Coolidge Street south of St.Anthony Boulevard,and the alley <br /> from Wilson Street to Coolidge Street south of Pahl Avenue. <br /> The project also proposes to replace the current storm sewer system in Wilson Street <br /> from 27`h Avenue to 29' Avenue, and the alleys located from Wilson Street to <br /> Coolidge Street both north and south of St.Anthony Boulevard. Three storm water <br /> storage basins are also proposed to be constructed as part of this project in the <br /> ' following locations: southwest quadrant of Wilson Street and Pahl Avenue;one-half <br /> block east of Wilson Street extending from Pahl Avenue to St. Anthony Boulevard, <br /> and one-half block east of Wilson Street north of St. Anthony Boulevard. <br /> It is also proposed that the existing 18-inch(18") vitrified clay pipe sanitary Y sewer <br /> in Wilson Street from 27'Avenue to 29`h Avenue be replaced with a 24-inch(24") <br /> PVC plastic pipe to resolve sanitary sewer issues in this portion of the City. <br /> Furthermore,existing water main is proposed to be replaced on Wilson Street from <br /> ' Pahl to St.Anthony Boulevard,Pahl Avenue from Wilson Street to Coolidge Street, <br /> and alley from Wilson Street to Coolidge Street north of St. Anthony Boulevard. <br /> I In summary, street, sanitary sewer, water main and storm sewer improvements are <br /> all proposed as part of this project. <br /> ' 2.3 Data Available <br /> Information and materials used in the preparation of this report include the following: <br /> ' City of St. Anthony Record Drawings <br /> • City of St. Anthony Topographic Maps <br /> • Interviews and discussion with property owners <br /> I Discussions from Public.Information Meetings <br /> • Field observations of area <br /> • Field survey data <br /> • Soil Investigation Report, August 1998 <br /> • Engineering analysis of selected flood problem areas within the.City of St. <br /> Anthony, March 1998 <br /> ' City of St.Anthony-1999 Street&Utility Improvement Project <br /> Feasibility Report A <br /> WSB Project No.1065.21 WSB <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.