My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09141999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 09141999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:09:51 PM
Creation date
12/30/2015 4:09:33 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 09141999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department of Public Works <br /> Paul L. Kirkwold,P.E.,Director and County Engineer <br /> ENGINEERING/OPERATIONS <br /> ADMINISTRATION/LAND SURVEY 3377 N. Rice Street <br /> 50 West Kellogg Blvd.,Suite 910 Shoreview,MN 55126 <br /> RAMSEY COUNTY St.Paul,MN 55102• (612) 266-2600• Fax 266-2615 (612)484-9104 • Fax 482-5232 <br /> August 16, 1999 <br /> Mr. Michael Morrison <br /> City Administrator <br /> City of Saint Anthony Village <br /> 3301 Silver Lake Road <br /> Saint Anthony, Minnesota 55418-1699 <br /> Dear Mike: <br /> Enclosed for your review and approval are the plans for the construction of traffic signals at County Road D <br /> and Highcrest Road, SAP 62-619-22. <br /> The traffic signal at County Road D and Highcrest Road is a new system with emergency vehicle pre- <br /> emption and requires city participation in the construction and maintenance costs. This system is also being <br /> interconnected to an existing system to the east at Old Highway 8. All construction and maintenance costs of <br /> . the interconnect will be 100% Ramsey County. <br /> Cost splits for the entire project are shown in the plans. A detailed engineers estimate has been included with <br /> the plans for your use. It is our understanding that the City wishes to utilize their MSA funds for this work <br /> and the required project numbers have been included in the plans. <br /> Please present these plans to your Council for approval. I will ask for your approval signature on the signal <br /> plan title sheet subject to the Council's favorable response to this project. <br /> Also included is a copy of agreement,No. 99010 between the County,New Brighton, Roseville and St. <br /> Anthony for the traffic signal work on County Road D. Please have the City Council execute the agreement. <br /> The original agreements are at the City of New Brighton. I will forward them to Saint Anthony for signature <br /> when available. I will forward you a fully signed original when executed by all the parties and the Ramsey <br /> County Board. <br /> Thank you for your cooperation in this matter. If you have any questions please feel free to give me a call. <br /> Sincerely, <br /> � J <br /> Daniel E. Soler, P.E. <br /> Traffic Engineer <br /> Enc. <br /> 33082-SA.doc Minnesota's First Home Rule County <br /> printed on recycled paper with a minimum or 10%post-consumer content <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.