My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11282000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 11282000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:18:44 PM
Creation date
12/30/2015 4:18:31 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 11282000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FILE No. 786 10/19 '00 1317 I D:TOLD DEVELOPMENT 612 278 7574 25 <br /> subdued signage to fit within their surrounding. hi addition, our building would be Mick <br /> on all four sides and would utilize only quality materials. <br /> The drive-thm operation of the building is located on the north side.of the property facing <br /> the rail line, and is'thus directed away from all residences and pedestrian views. Only <br /> prescriptions may be dropped off and picked up at the drive-thru, and no loudspeaker <br /> system is used in the process. <br /> The loading area of the building is positioned on the west side'facing the adjacent <br /> industrial property and is fully screened from view by a brick wall that matches the <br /> building exterior. Loading operations are conducted through a double door rather than a <br /> loading dock and typically involve only one semi-trailer delivery per week. <br /> Approvals <br /> To facilitate development of a commercial use, we will be requesting that the vacant <br /> parcel owned by Village Properties be re-zoned from it's current industrial classification <br /> to that of the commercial zoning existing on the Amoco property. We would work with. <br /> Mr. Solie to see that the final platting process he has already commenced is carried out in <br /> the manner required for our parcel. In a previous meeting with Mr. Mornson it sounded <br /> as though an administrative subdivision rather than prelftidnary and final platting may be <br /> possible. Please let me know the most efficient process to follow. <br /> • I' have directed our architect to consult the St. Anthony zoning ordinances with respect to <br /> parking requirements and setbacks, and to the best of my knowledge we are in <br /> compliance with all governing regulations. Our building and site signage will be <br /> designed to meet the St. Anthony signage criteria, and can be submitted whenever <br /> appropriate. I understand that we will need to request a conditional use permit for the <br /> drive-thru pharmacy operation. <br /> 'Tax Increment Assistance <br /> As I understand it from my meeting with yourself and Mr.Mornson, there may be TTF <br /> funds that were set aside for this property some time ago. Given the costs associated with <br /> our redevelopment,specifically the environmental clean-up that we expect, the poor soils <br /> conditions that will require an expensive foundation system, and the significant grading <br /> and demolition that is required, we would certainly like to pursue the possibility of tax <br /> increment assistance. <br /> I believe our project would not only remove a defunct store, but also would add to ilia <br /> Saint Anthony tax base, and create a quality project. In addition, a national retailer with a <br /> stable financial position could help stimulate investment and job creation elsewhere in the <br /> area. TOLD would be leasing the building to Walgreens for a minimum of twenty years <br /> so you can be confident that everyone involved will be making a long-term commitment <br /> to the community. <br />
The URL can be used to link to this page
Your browser does not support the video tag.