Laserfiche WebLink
MMRWMO 2002 PROJECT SUMMARY <br /> PROJECT: North Mississippi Regional Park Habitat Restoration <br /> • LOCATION: North Mississippi Regional Park <br /> SCOPE: Prairie Restoration on 16.4 acres <br /> Streambank Restoration for 240 lineal feet <br /> Interpretive Signage <br /> DETAILS: <br /> Prairie Restoration on 16.4 acres with short grass prairie: <br /> I <br /> Spring 2002 _ <br /> Herbicide Treatment of Sites for Removal of Non-native Species (including Reed Canary Grass) <br /> Prescribed Burn of the Site <br /> Soil Preparation (16.4 acres), Mulching (5 acres)and Seeding (16.4 acres) I <br /> Summer 2002 <br /> Mowing of the Site { <br /> Fall 2002 <br /> Mowing of the Site <br /> Spring 2003 I, <br /> Prescribed Burn of the Site <br /> Streambank restoration of 240 lineal feet: <br /> Engineering and design (10%) �. <br /> Construction of bioengineered streambank mediation measures i <br /> Interpretive signage related to native plant restoration, streambank and riparian buffers and river <br /> water quality: i <br /> • Display package for river water quality for North Mississippi River Interpretive Center <br /> Includes design, build and installation <br /> Interpretive signage for park () <br /> i <br /> i. <br /> COST BREAKDOWN: <br /> Prairie.Habitat Restoration <br /> Herbicide Treatment of Sites Prescribed Burn of the Site $100/acre= $ 1,640 <br /> Prescribed burn 2 @ $1,000 each = $ 2,000 <br /> Soil Preparation (16.4 acres) and Seeding (16.4 acres) $2,750/acre= $45,100 <br /> Mulching (5 acres) $450/acre= $ 2,250 <br /> Mowing (16.4 acres) 2 @ $800/acre $26.24 0 <br /> Total <br /> $77,230 <br /> Display packaae for Interoretive Center <br /> Design (22%) $15,000 <br /> Fabrication. $46,000 <br /> Installation 7.00 <br /> Total <br /> $68,000 <br /> _Park interoretive:sians t <br /> Design text:and.graphics:using°MPRB.standard 8 @:$550.each= <br /> $4,400 <br /> Construction-and installation:of:podium-style zigns 8'@ $2,200.each= $17.60 <br /> Total $219-600 <br /> r- <br /> f' <br /> Streambank-Restoration. <br /> Engineering and design (10%) f. <br /> • $2,560 <br /> Construction-of:bioengineeredstreambank ,2001ineal.feet�,@1:$378Jfoot :,- 7 600 � <br /> Total <br /> ,$-83;160 k <br /> 7 <br /> i <br />