Laserfiche WebLink
' 2001 Street& Utility Construction Project Opinion of Proabable Cost <br /> City of St.Anthony,MN <br /> ' Schedule C-Watermain <br /> Item No. Description Quantity Unit Unit Cost Total <br /> ' 1 Remove or Abandon Watermain 3,790 LF $3.00 $11,370.00 <br /> 2 Remove Valve and Box 9 EA $100.00 $900.00 <br /> 3 Remove Water Service&Curb Box 63 EA $60.00 $3,780.00 <br /> ' 4 Salvage Hydrant 5 EA $300.00 $1,500.00 <br /> 5 lTemporary Water Service 1 LS $12,000.00 $12,000.00 <br /> 6 8"Gate Valve&Box 14 EA $650.00 $9,100.00 <br /> 7 Connect to Existing Watermain 9 EA $500.00 $4,500.00 <br /> 8 Connect to Existing Water Service 63 EA $100.00 $6,300.00 <br /> ' 9 1"Corporation Stop 63 EA $60.001 $3,780.00 <br /> 10 11"Curb Stop and Box 63 EA $80.00 $5,040.00 <br /> 11 Hydrant 6 EA $1,400.00 $8,400.00 <br /> ' 12 1"Type K Copper Pipe 2,079 LF $10.00 $20,790.00 <br /> 13 8" Watermain-Duct Iron CL 52 W/Poly Wrap 3,790 LF $26.00 $98,540.00 <br /> 14 4" Polystyrene Insulation 25 SY $16.00 $400.00 <br /> 1 15 IDuctile Iron Fittings 5,060 LB $2.00 $10,120.00 <br /> Subtotal $196,520.00 <br /> ' +10%Contingencies $19,652.00 <br /> Subtotal $216,172.00 <br /> ' +30%Administrative $64,851.60 <br /> Grand Totall $281,023.60 <br /> 1 <br /> 1 <br />