Laserfiche WebLink
' 2001 Street& Utility Construction Project Opinion of Proabable Cost <br /> City of St.Anthony,MN <br /> Schedule D-Storm Sewer <br /> 1 Item No. Description Quantity Unit Unit Cost Total <br /> ' I Remove Sewer Pipe(Storm) 1,950 LF $6.00 $11,700.00 <br /> 2 Remove Manhole or Catch Basin 27 EA $300.00 $8,100.00 <br /> 3 Salvage Casting 27 EA $100.00 $2,700.00 <br /> ' 4 Granular Foundation and/or Bedding 1000 CY $12.00 $12,000.00 <br /> 5 15"RC.Pipe Design 3006 Class V 800 LF $26.00 $20,800.00 <br /> ' 6 36"RC Pipe Design 3006 Class II 750 LF $65.00 $48,750.00 <br /> 7 48 RC Pipe Design 3006 Class II 550 LF $110.00 $60,500.00 <br /> 8 66"RC Pipe Design 3006 Class I11 1250 LF $170.00 $212,500.00 <br /> ' 9 60"Diameter Manhole 22 LF $250.00 $5,500.00 <br /> 10 72"Diameter Manhole 22 LF $270.00 $5,940.00 <br /> 11 102" Diameter Manhole 33 LF $450.00 $14,850.00 <br /> ' 12 108"Diameter Manhole 11 LF $600.00 $6,600.00 <br /> 13 120"Diameter Manhole 22 LF $900.00 $19,800.00 <br /> 14 Casting Assembly 15 EA $300.00 $4,500.00 <br /> ' 15 Catch Basins 39 EA $1,400.00 $54,600.00 <br /> 16 Connect to Existing Storm Sewer 6 EA $800.00 $4,800.00 <br /> Subtotal $493,640.00 <br /> ' +10%Contingencies $49,364.00 <br /> Subtotal $543,004.00 <br /> +30%Administrative $162,901.20 <br /> ' Grand Total $705,905.20 <br /> t <br /> 1 <br />