My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04092002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 04092002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:56:33 PM
Creation date
12/30/2015 7:56:20 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 04092002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> • The total City costs for the 33`d Avenue improvements is as <br /> follows: <br /> 1. City Storm Sewer fund - $14,234 <br /> 2. City Sanitary Sewer fund - 91,416 <br /> 3. City bonding with future MSA reimbursement - 363,664 <br /> Total City $469,314 <br /> MSA Year 2000 Funds 221,486 <br /> $690,800 <br /> The City will be required to finance all preliminary engineering costs and <br /> ' then seek reimbursement from its State Aid account at the time of <br /> contract award and from the future draw from the MSA account. The City <br /> must also finance all construction engineering and testing costs prior to <br /> MSA reimbursement. <br /> 8.0 Project Schedule <br /> City Orders Feasibility Report September 14 1999 <br /> P , <br /> Neighborhood Informational Meeting October 28, 1999 <br /> Receive Project Feasibility Report/Order Plans <br /> and Spec Preparation November 30, 1999 <br /> ' Submit Plans for State Aid Review and Approval January 24, 2000 <br /> Approve Plans and Specs/Order Ad for Bids March 14, 2000 <br /> Receive Bids/Contract Award April 11, 2000 <br /> 1 Neighborhood Project Initiation Meeting May 2000 <br /> Begin Construction May 2000 <br /> Construction Substantial Completion September 2000 <br /> Final Completion October 2000 <br /> 9.0 Conclusions and Recommendations <br /> 1. The majority ofthe existing structural section ofpavement appears <br /> to be adequate for present traffic volumes. <br /> 2. Some cracking and joint deterioration has occurred due to age and <br /> normal wear of the pavement. <br /> 3. Settlement and frost heavin g g have damaged some sections of <br /> pavement. These sections should be replaced. <br /> 4. A number of repair methods which are less costly than total <br /> replacement, should be used where structural integrity has not <br /> been compromised. <br /> 33r1 Avenue Improvements Silver Lake Road to Stinson Boulevard A-SANTH9902.00 <br /> St. Anthony, Minnesota Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.