Laserfiche WebLink
a.. <br /> 5. Deteriorated joints and small cracks should be repaired to prevent <br /> erosion of subgrade material and future pavement damage. <br /> 6. Pavement should be planed to improve ridability. <br /> 7. On-street parking is sufficient along the roadway.Widening of the <br /> street is not necessary. <br /> 8. Sanitary sewer pipeline installation on Edward Street and storm <br /> sewer improvements should be accomplished prior to the concrete <br /> pavement rehabilitation. <br /> ' 9. Sidewalk improvements should be installed from Silver Lake Road <br /> to Stinson Boulevard to improve pedestrian safety. <br /> 10. Total project cost is estimated to be $690,800. Repair and <br /> rehabilitation of the existing street is a more cost-effective <br /> approach than complete reconstruction and replacement. <br /> 1 <br /> 33rd Avenue Improvements Silver Lake Road to Stinson Boulevard A-SANTH9902.00 <br /> ' St. Anthony, Minnesota Page 10 <br />