My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 03171987
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1987
>
PL PACKET 03171987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:34:04 PM
Creation date
12/30/2015 3:33:39 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1987
SP Name
PL PACKET 03171987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-16- <br /> City has preliminary agreement for permanent easement. <br /> Project " 20 or 30 large trees whose. roots would probably be cut <br /> problems': with construction- which may- or may not be -,lost and have ., <br /> :. to- be replaced by-,Park Board; <br /> the removal costs for only three have been included in <br /> project cost; <br /> engineer estimated it would cost .$600 a tree_ to..cut down <br /> and remove stump and replacement cost would depend. on <br /> size of replacement tree; <br /> should be paid- . for by Park Board because .-on their <br /> property. <br /> Drainage nothing beyond the construction area would be done; <br /> system: <br /> minimum size pipes would be replaced with larger 12 or <br /> 15 inch capacity pipes as required by City or extension <br /> later on. <br /> Curbing: would be tapered to 16 inches from existing 24 inches <br /> at ends of the project resulting in a savings. for the <br /> City. <br /> Lighting: conduits would' be included. in project cost but lights <br /> themselves would not because they are not MSA covered <br /> items unless they are needed at ' intersections for <br /> safety. <br /> Sidewalks: appear to be in' ,relatively decent shape--so not included <br /> in the project cost. <br /> Requirements' that only one=half of the roadway be cut at a time and <br /> of contractor: excavations would -be covered when ever possible to. <br /> prevent flooding when: it rains. <br /> The following -points were discussed with the staff and engineer: <br /> Marks - -asked -if widening the street might not encourage speed.- <br /> :ing. ' Was told that ,was a- police enforcement problem. <br /> Mr.:-Hamer- said the street width. is based ony traffic <br /> -flow and recent counts show much-more traffic .on this <br /> . section of St, .Anthony Boulevard than on the' resi <br /> dential section- j.ust completed. <br /> 'S u l-And = indicated- skepticism that... Park Board would eve x-. agree to••:. <br /> pay: for. the trees which had to .be..° replaced and saw the <br /> City facing a big -expense -if they. had to replace 20 or :. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.