My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01101984
StAnthony
>
City Council
>
City Council Packets
>
1984
>
CC PACKET 01101984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:54:34 PM
Creation date
12/30/2015 3:54:13 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 01101984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> EXEaW A County Road D <br /> &P. 62-619-04 <br /> S.P. 27-093-01 <br /> Summary - St. Anthony Participation <br /> Storm sewer $ 0.00 <br /> Curb and gutter 3,749.11 <br /> Sidewalk 13,151.41 <br /> Signals 852.63 <br /> Estimated construction total , <br /> Less credit for CDBG funds <br /> Total estimated amount T--.Oa <br /> Storm Sewer - Estimated total storm sewer cost = $276,383.00 <br /> *Participating @ 87.22% $241,061.25 <br /> *Nonparticipating <br /> (Hennepin County) St. Anthony @ 3.10% $ 8,567.87 <br /> (Ramsey County) St. Anthony @ 0% 0.00 <br /> New Brighton @ 8.73% 24,128.24 <br /> Roseville @ 0895% 2,625.84 <br /> 1278% 35 321.75 <br /> $276,'383.00 <br /> St. Anthony's share of nonparticipating storm sewer . <br /> +.. { in Ramsey County $ 0.00 <br /> *Per Mn/DOT 9/27/83 hydraulics memo <br /> Curb do Gutter <br /> Estimated total curb and gutter in St. Anthony 3,089 LF. <br /> Estimated total curb and gutter in New Brighton 5,068 L.F. <br /> Estimated total curb and gutter in Roseville 4199 LF. <br /> Estimated total curb and gutter in Ramsey County 12'358 LIT. <br /> Total B624 curb and gutter In St. Anthony 3,089 LF. <br /> Credit for existing curb and gutter in St. Anthony <br /> @ Silver Lake Road, Sta. 8+00 to 11+40 Rt and Lt - 615 LF. <br /> Credit for existing curb and gutter in St. Anthony <br /> @ Foss Road - 34 L F. <br /> , 4M0 L7 <br /> 2,440 LF. x $5.65/LF. $13,786.00 <br /> St. Anthony's share (75% x $13,786.00) $10,339.50 <br /> Preliminary engineering (8% x $10,339.50) 827.16 <br /> Construction engineering (5% x $10,33.50) 516.98 <br /> St. Anthony's share in Ramsey County TIT,6 3. <br /> -`' Less FAU funds (76.74% x $10,339.50) - 7,934.53 <br /> Total St. Anthony's share in Ramsey County $ 3,749.11 <br /> 84015 <br /> 1-A <br />
The URL can be used to link to this page
Your browser does not support the video tag.