Laserfiche WebLink
• EXHIBIT A County Road D <br /> S.P. 62-619-04 <br /> S.P. 27-093 41 <br /> Sidewalk <br /> Aggregate Base, Total <br /> 4" Concrete Walk (Sidewalk) Class 6 (or 5% crushed) Sidewalk <br /> Unit Unit <br /> S.F. Price Amount Ton Price Amount <br /> St. Anthony 21,694 1.50 $32,541.00 1,066 6.25 $ 6,662.50 $ 39,203.50 <br /> New Brighton 24,395 1.50 36,592.50 1,548 6.25 9,675.00 46,267.50 <br /> Roseville 19,810 1.50 29,715.00 723 6.25 4,516.75 34,233.75 <br /> Total in <br /> Ramsey County 85,899 $98,848.50 3,337 $20,856.25 $119,704.75 <br /> Total sidewalk In St. Anthony $39,203.50 <br /> Credit for existing sidewalk @ Chandler Drive <br /> 585 S.F. + agg. base (585 x $1.50) + (20 x $6.25) - 1,002.50 <br /> Credit for existing sidewalk at Silver Lake Road <br /> 1,100 S.F. + agg. base (1,100 x $1.50) + (45 x $6.25) 1 931.25 <br /> $36',26975 <br /> Preliminary engineering (8%) x $36,269.75) 2,901.58 <br /> Construction engineering (5% x $36,269.75) 1 813.49 <br /> $40',084.82 <br /> Less PAU funds ($36,269.75 x 76.74%) 27,833.41 <br /> Total St. Anthony's share in Ramsey County $ 13,151.41 <br /> Traffic Control Signal System A <br /> Total cost of Signal System A $85,000.00 <br /> St. Anthony in Ramsey County (12.5% x $85,000.00) $10,625.00 <br /> Ramsey County (37.5% x $85,000.00) 31,875.00 <br /> Hennepin County (50% x $85,000.00) 42,500.00 <br /> St. Anthony in Ramsey County $10,625.00 <br /> Preliminary engineering (8%) 850.00 <br /> Construction engineering (5%) 531.25 <br /> 12,006.25 <br /> Less PAU funds (76.74% x $10,625.00) 8,153.63 <br /> Total St. Anthony's share in Ramsey County $ 3,852.63 <br /> 84015 <br /> 2-A <br /> • <br />