My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05121992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 05121992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:16:34 PM
Creation date
12/30/2015 8:16:18 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 05121992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I REGULAR COUNCIL MEETING <br /> 2 APRIL 28 , 1992 <br /> 3 PAGE 14 <br /> 4 <br /> 5 <br /> 6 <br /> 7 Motion by Enrooth, second by Marks to approve the <br /> 8 recommendations of the Public Works Director for the <br /> 9 purchase of road materials and Water Department supplies <br /> 10 for 1992 as noted in his memo dated April 23 , 1992 . <br /> 11 <br /> 12 It was noted that costs are based on usage for these <br /> 13 purchases . <br /> 14 <br /> 15 Motion carried unanimously <br /> 16 <br /> 17 <br /> 18 . B. Appoint Enaineer to do Analysis of the Drainaae System to <br /> 19 Ponds in Northeast Corner of Salvation Army Camp <br /> 20 <br /> 21 The City Manager noted that the Wexford Heights <br /> 22 development is already into its second phase and there <br /> 23 appears to be no concern in place for drainage . <br /> 24 <br /> 25 The Salvation Army Camp has hired Barr Engineering to <br /> 26 study the water quality. The Camp is impacted by the <br /> 27 water runoff from the Wexford Heights development as well <br /> 28 as water runoff from Silver Lake Road and County Road E. <br /> 29 <br /> 30 It was suggested that St . Anthony, New Brighton, Ramsey <br /> 31 County, the Salvation Army Camp and the developer of <br /> 32 Wexford Heights all meet to discuss their mutual <br /> 33 concerns . The City Manager advised that St . Anthony will <br /> 34 take the lead in coordinating the solutions for water <br /> 35 runoff problems . He noted that Rice Creek Watershed <br /> 26 District will also be involved. The developer will pay <br /> 37 costs as will other entities for solutions . <br /> 38 <br /> 39 A letter was received from Barr Engineering stating their <br /> 40 proposal for performing an. analysis of the drainage <br /> 41 system tributary to the ponds in the northeast corner of <br /> 42 the Salvation Army Camp. It was stated that the goal of <br /> 43 the study is to recommend the most cost effective <br /> 44 drainage system for the area , considering conveyance <br /> 45 needs , right-of-way and property concerns , and future <br /> 46 runoff treatment systems . <br /> 47 <br /> 48 C . Approval of Contractor for Reconstruction of Old Highway <br /> 49 # 8 <br /> 50 <br /> 51 Six bids were received for the reconstruction of Old <br /> 52 Highway #8 . The low bid of $254 , 489 . 35 was from F.M. <br /> 53 Frattalone Excavating. This bid was under that <br /> 54 engineering estimate . <br />
The URL can be used to link to this page
Your browser does not support the video tag.