Honorable Mayor, Council and Staff <br /> City of St Anthony <br /> Proposed Construction Schedule of Flood Problem Area Improvements <br /> WSB Project No. 1065.10 <br /> May 13, 1998 <br /> Page 2 <br /> Begin Final Construction Construction <br /> Project to Be Undertaken Design Start End <br /> IV. Construct overflow basin in the Nov. 1998 April 1999 Sept. 1999 <br /> vicinity of 31"Ave between Harding <br /> Street and Silver Lake Road and <br /> appurtenant road improvements <br /> (Problem Area 5) <br /> V Construct overflow basin at Emerald Jan. 1999 Sept. 1999 Dec. 2000* <br /> Park and appurtenant road <br /> improvements. (This project will be <br /> dependent on DNR funding in 1999.) <br /> *Parks available for winter sports only <br /> The above construction schedule completes the improvements proposed for Problem Areas 2, 3, 5, 8, 9, <br /> 10 and 12 as outlined in the Engineering Analysis Report. In addition, it is anticipated that the Flood <br /> Proofing Grant Program will provide solutions for problem areas 6, 7 and 11. 0 <br /> The Flood Proofing Grant Program will increase the level of protection but may not provide 100-year flood <br /> protection for flood problem areas 1 and 4. It is also our recommendation that the Rice Creek Watershed <br /> District be approached to study the drainage issues associated with Ramsey County Ditch #3 prior to <br /> construction of the proposed improvements at Emerald Park. We are aware that some improvements <br /> downstream are pending, which may increase the level of flood protection in this area. <br /> A total estimated cost for the above-recommended construction improvements from 1998 through 2000 <br /> is approximately$6 million dollars. <br /> If you have any questions,please do not hesitate to contact us at 541-4800. <br /> Sincerely, <br /> WSB & Associates,Inc. <br /> Todd E. Hubmer, P.E. Peter R. Willenbring,P.E. <br /> Project Engineer Vice President <br /> sm/lv/bj f <br /> FAWPW IM1065.10\051398-hmc.wpd <br />