My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01252000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 01252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:11:59 PM
Creation date
12/30/2015 4:11:44 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 01252000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3® <br /> B RW <br /> • ;1' i', A DAMES&MOORE GROUP COMPANY <br /> Thresher Square <br /> 700 Third Street Soudt <br /> Minneapolis,Minnesota 554 15 <br /> December 21, 1999 612 370 0700 Tel <br /> 612 370 1378 Fax <br /> «1%wbnvinc.com <br /> Jay Hartman <br /> Public Works Director <br /> City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418-1699 <br /> RE: Central Park Improvements <br /> Dear Jay: <br /> Thank you for the opportunity to present this proposal for preparation of final design and <br /> construction documents for the remainder of the Central Park Master Plan. For purposes of <br /> efficiency we suggest that the final design work for the remainder of the park be executed as one <br /> task with the subsequent construction documents being prepared in one.last phase. We are <br /> . considering the tennis courts and Water Tower Park as the first phase of the overall Central Park <br /> implementation project. The second phase will consist of all the remaining facilities outlined in <br /> the Master Plan. <br /> The following work program outlines the tasks to be performed: <br /> Task I. Completion of Field Surveying <br /> The north portion of the park was surveyed by WSB in 1998 for the flood control work. The <br /> water tower area of the park and school properties were surveyed by BRW last spring. We <br /> propose to complete the surveying of the middle of the park in order to prepare accurate plans <br /> and bid documents for the rest of the park design. The survey work will focus on the middle <br /> portion of the park between the new tennis courts on the south and the new drainage area on the <br /> north. We will also include the Civic Center building, parking lot and High School stadium area. <br /> The data will be combined with data from the north and south portions of the park to create a <br /> complete physical survey of Central Park. <br /> Obtain digital site data including, property boundaries, locations of sewer, water and storm <br /> drain utility lines, buildings, trees over 8 inches in diameter, curb and gutter and <br /> corresponding elevations, etc. <br /> Translate field data into a base map for accurately engineering proposed park <br /> • improvements. Incorporate previous survey data into overall Central Park'map. <br /> Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.