My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01252000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 01252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:11:59 PM
Creation date
12/30/2015 4:11:44 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 01252000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> �. <br /> BRW <br /> A DAMES&MOORE GROUP COMPANY <br /> Thresher Square <br /> 700 Third Scree[South <br /> Minneapolis.Minnesota 55413 <br /> Jay Hartman 613 370 0700 Tel <br /> 612 370 1378 Fax <br /> December 21, 1999 %%-%,1,-.br%vinc.com <br /> Page 2 <br /> Task II. Site Engineering and Design Development <br /> Translate conceptual playing fields, trails, playground, parking lots, performance arts area <br /> etc., to accurately fit into site survey/base map. <br /> Attend monthly Parks Commission meetings to facilitate design review sessions and assist <br /> in temporary athletic field reassignment/organization discussions during the design and <br /> cost estimating process (approximately 3 months). <br /> Prepare preliminary site grading plan for the parking lot modifications, sled hill, playing <br /> fields, north play ground modifications and other park improvements. <br /> Prepare drawings for decorative fencing, walkways and landscaping. Water Tower Park <br /> design elements will be used as a starting point for the design of these and other park <br /> . elements. <br /> Prepare refined site development cost estimate. <br /> Prepare a Construction Sequencing Plan depicting the order of events for the various park <br /> improvements. <br /> Refine design and prepare colored plans and cross sections graphics for depiction of design <br /> development efforts and present to the City at a special community meeting/Central Park <br /> open house. <br /> Task III. Final Phase Two Park Construction Documents <br /> Refine Phase Two park plans based upon comments, suggestions, etc. <br /> Prepare construction documents for Phase Two: Layout plans, planting plans, electrical <br /> plans, grading and drainage plans, utility plan, cross sections &profiles, details, <br /> specifications, bid form and engineer's estimate. (This task will require approximately two <br /> months to complete). <br /> Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.