My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01252000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 01252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:11:59 PM
Creation date
12/30/2015 4:11:44 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 01252000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br /> BRW <br /> .�eL:, <br /> ;-' T. LT _13 A DAMES&MOORE GROUP COMPANY <br /> Jay Hartman <br /> December 21, 1999 <br /> Page 3 <br /> Task IV. Public Hearing. Advertisement for Bids and <br /> Bid Letting <br /> Attend public hearing to present project, answer questions, etc. <br /> Assist the Public Works Director in the preparation of advertisement for bids. <br /> Attend bid opening, review and tabulate bids. <br /> Task V. Construction Administration and Observation <br /> Assist City Engineer in award and administration of construction contract. <br /> Observe construction. review shop drawings and testing and inspection reports, review <br /> . grade lines and layouts and report monthly progress to Parks Commission. <br /> Facilitate regular construction progress meetings with contractor and City Engineer and <br /> review contractors application for payment and change orders. <br /> Prepare final punch list and review project completion. <br /> Schedule and Meetings <br /> We estimate the entire process will take approximately 4 to 5 months. We propose to finalize the <br /> Phase Two plans by the end of October 2000 to allow bidding in January 2001 and a construction <br /> start in April 2001. Surveying should begin as soon as possible to expedite the design <br /> development process. <br /> Regular review meetings (1 per month) with the Public Works Director and Parks Commission <br /> will be part of the design, engineering and construction process. <br /> Estimated Construction Cost <br /> Based upon our discussions with the Parks Commission on December 13th, we have included <br /> monies for athletic field lighting, batting cages, backstop netting, athletic field irrigation and an <br /> . outdoor performance area in the preliminary estimate of construction costs. These items increase <br /> Offices V.orld^:ide <br />
The URL can be used to link to this page
Your browser does not support the video tag.