Laserfiche WebLink
Mr. Karl Keel- 64 <br /> August 17, 2000 <br /> Page 2 <br /> costs to complete installation of this EVP system. The total estimated cost for an EVP system at this <br /> intersection includes: installation of one (1) detector.and indicator light,-for each intersection . <br /> approach, installation of one.(1) additional detector for the-eastbound intersection.approach,.(to <br /> account for a curve in the roadway to the west), and costs for Hennepin County to upgrade the <br /> controller cabinet to allow for EVP to be made operational at the intersection. <br /> Please consider this request for participation in the costs for installation of an EVP system at this <br /> intersection. If acceptable to you,please inform me as to how the City of Roseville would intend <br /> to fund their portion of the project (via local funds, State Aid funds, or other source). <br /> Please feel free to contact me at (651)490-2073 if you have any comments or questions related to <br /> this request for participation in an EVP system at New Brighton Boulevard (CSAH 88) and 29th <br /> Avenue Northeast, or on the project in general. <br /> Attached, for your information, is a copy of the study prepared by SEH, detailing the City of St. <br /> Anthony's proposed EVP installation project(costs.and proposed work at each intersection). <br /> �. Sincerely, <br /> Short Elliott Hendrickson Inc. <br /> John M. Gray, P.E. <br /> Project Engineer <br /> jmg <br /> Enclosures <br /> c: Jay Hartman, City of St. Anthony <br /> Jay Olson, St. Anthony Village Fire Department <br /> Doug.Strong, City.of Roseville <br /> Q%123R5WAW0RK\R0SENffi 90.WPD <br /> • <br />