Laserfiche WebLink
--�} rY ,,,'''r°'n „„�;, � *.'•t-r+-�9. y.�F-r Q' ^a';T-°`+� "f,.^c.,t?., rtTw" �tyb�''. vhJ��-5 9 <br /> - <br /> - ::'4',N,�T�pr'YT�1r SR�.�{�:•:�^�(i.'��x y','+t�� ���� r _ �.i`j����� � ��r ��'�u��,•�+,��1�� F( y <br /> ,++.,I.....i?_,_ r.-...f::ver.,_-rrc;`r S... _�cR..rv3.n_ .G, _ Ae �' ._ :t l�_ Pect b'�.'�",iS^ih•'°•:._7 i <br /> 2001 Street Reconstruction,Storm Sewer,Watermaln,Sanitary Sewer,Pond Excavation&Appunt.Work <br /> City of St.Anthony,MN <br /> • WSB Project No.1065-51 <br /> OWNER: CONTRACTOR: <br /> City of St.Anthony Park Construction <br /> 3301 Sliver Lake Road 7900 Beech Street North <br /> St.Anthony,MN 55418 Minneapolis,MN 55432 <br /> YOUR ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: <br /> Add the following items and quantities for improvements at Silver Point Park: <br /> Mobilization(2.0%Max.) 1 Lump Sum <br /> Salvage&Install Ballfield Material 1 Lump Sum <br /> Salvage&Install Riprap 6 Cubic Yards <br /> Common Excavation(Haul Off-Site) 350 Cubic Yards <br /> Common Excavation-Grading 1,000 Cubic Yards <br /> Common Borrow(Import/Haul from Harding Street) 810 Cubic Yards <br /> Retaining Wall 320 Square Feet <br /> 6'PVC Draintile&Pipe(Intl.Tee&Connects) 601 Linear Feet <br /> 6'PVC Pipe-San.Sewer 160 Linear Feet <br /> Connect to Existing Sanitary Manhole 1 Each <br /> Construct Drainage Structure-PVC Golf Course Type 4 Each <br /> 1'Copper Service(Intl.Curb Stop) 150 Linear.Feet <br /> CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: <br /> ® ORIGINAL CONTRACT PRICE: $1,603,648.50 ORIGINAL CONTRACT TIME: <br /> PREVIOUS CHANGE ORDERS: NO. TO $0.00 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE <br /> CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: $1,603,648.50 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: <br /> NET INCREASE(DECREASE OF THIS CHANGE ORDER $36,351.15 NET INCREASE OF CHANGE ORDER: NONE <br /> CONTRACT PRICE WITH ALL APPROVED CHANGE ORDER: $1,639,999.65 CONTRACT TIME WITH APPROVED CHANGE ORDERS: <br /> RECOMMENDED BY: APPROVED BY: <br /> Todd E.Hubmer,P.E. <br /> WSB&ASSOCIATES.INC. Park Construction <br /> ENGINEER CONTRACTOR <br /> APPROVED BY: <br /> CITY ENGINEER MAYOR <br /> • DATE <br /> F:\wpWn\1065-51\EXCEL\voucher.xls\ChangeOrder <br />