Laserfiche WebLink
_ 54 <br /> i; ��;, , � � 'fi�w-7Y�.T1 era r 'g: •4'� re Sr " - ?r't � o- � !^ A f � ''� <br /> 2001 Street Reconstruction, Storm Sewer,Watermain, Sanitary Sewer, <br /> Pond Excavation and Appurtenant Work <br /> City of St.Anthony, MN <br /> WSB Project No. 1065-51 <br /> Date: October 17,2001 <br /> Item Extended <br /> No. Description Qty Unit Price Amount <br /> 1 Mobilization (2.0% Max.) 1 Lump Sum $500.00 $500.00 <br /> 2 Salvage & Install Ballfield Material 1. Lump Sum $4,900.00 $4,900.00 <br /> 3 Salvage& Install Riprap 6 Cubic Yards $65.00 $390.00 <br /> 4 Common Excavation (Haul Off-Site) 350 Cubic Yards _ $9.00 $3,150.00 <br /> 5 Common Excavation -Grading 1000 Cubic Yards $5.60 $5,600.00 <br /> 6 Common Borrow(Import/Haul from Harding Street) 810 Cubic Yards $3.75 $3,037.50 <br /> 7 Retaining Wall 320 Square Feet $18.00 $5,760.00 <br /> 8 6" PVC Draintile&Pipe (Incl. Tee &Connects) 601 Linear Feet $8.65 $5,198.65 <br /> 9 6" PVC Pipe-San. Sewer 160 Linear Feet $19.00 $3,040.00 <br /> ® 10 Connect to Existing Sanitary Manhole 1 Each $625.00 $625.00 <br /> 11 Construct Drainage Structure- PVC Golf Course Type 4 Each $400.00 $1,600.00 <br /> 12 1" Copper Service(Incl. Curb Stop) 150 Linear Feet $17.00 $2,550.00 <br /> Total $36,351.15 <br /> • <br /> F:\wpwin\1065-51\Excei\voucher.xls\CO Detail <br />