My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 05282002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 05282002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:57:11 PM
Creation date
12/30/2015 7:57:02 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 05282002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56 <br /> Manager-Adviser Edition, current as of the date of this Manager's services, the Architect's services and the Owner's <br /> Agreement. responsibilities with anticipated construction schedules, <br /> highlighting critical and long-lead-time items. <br /> 1.1.3 The Construction Manager shall provide sufficient <br /> organization, personnel and management to carry out the 2.2.6 As the Architect progress with the preparation of the <br /> requirements of this Agreement in an expeditious and Schematic, Design Development and Construction <br /> economical manner consistent with the interests of the Owner. Documents, the Construction Manager shall prepare and <br /> update, at appropriate intervals agreed to by the Owner,' <br /> 1.1.4 The services covered by this Agreement are subject to Construction Manager and Architect, estimates of <br /> the time limitations contained in Subparagraph 13.5.1. Construction Cost of increasing detail and refinement. The <br /> estimated. cost of each Contract shall be indicated with <br /> ARTICLE 2 supporting detail. Such estimates shall be provided for the <br /> SCOPE OF CONSTRUCTION MANAGER'S Architect's review and the Owner's approval.The Construction <br /> BASIC SERVICES Manager shall advise the Owner and Architect if it appears that <br /> the Construction Cost may exceed the latest approved Project <br /> 2.1 DEFINITION budget and make recommendations for corrective action <br /> 2.1.1 The Construction Manager's Basic Services consist of 2.2.7 The Construction Manager shall consult with the <br /> those described in Paragraphs 2.2 and 2.3 and any other services Owner and Architect regarding the Construction Documents <br /> identified in Article 14 as part of Basic Services. and make recommendations whenever design details adversely <br /> affect constructibility,cost or schedules. <br /> 2.2 PRE-CONSTRUCTION PHASE 2,2.8 The Construction Manager shall provide <br /> 2.2.1 The Construction Manager shall review the program recommendations and information to the Owner and Architect <br /> regarding the assignment of responsibilities for temporary <br /> furnished by the Owner to ascertain the requirements of the Project facilities and equipment, materials and services for <br /> Project and shall arrive at a mutual understanding of such common use of the Contractors. The Construction Manager <br /> requirements with the Owner. shall verify that such requirements and assignment of <br /> responsibilities are included in the proposed Contract <br /> 2.2.2 The Construction Manager shall provide a preliminary Documents. <br /> evaluation of the Owner's program, schedule and construction <br /> budget requirements,each in terms of the other.Construction 2,2,9 The Construction Manager shall provide <br /> Manager shall provide Cost estimates as required for recommendations and information to the Owner regarding the <br /> feasibility studies about the project. allocation of responsibilities for safety programs among the <br /> Contractors. <br /> 2.2.3 Based on early schematic designs and other design <br /> criteria prepared by the Architect, the Construction Manager 2.2.10 The Construction Manager shall advise on the <br /> shall prepare preliminary estimates of Construction Cost for division of the Project into individual Contracts for various <br /> program requirements using area,volume or similar conceptual categories of Work, including the method to be used for <br /> estimating techniques. The Construction Manager shall selecting Contractors and awarding Contracts. If multiple <br /> provide cost evaluations of alternative materials and systems. Contracts are to be awarded, the Construction Manager shall <br /> review the Construction Documents and make <br /> 2.2.4 The Construction Manager shall expeditiously review recommendations as required to provide that (1) the Work of <br /> design documents during their development and advise on the Contractors is wordinated, (2) all requirements for the <br /> proposed site use and improvements, selection of materials, Project have been assigned to the appropriate Contract, (3) the <br /> building systems and equipment, and methods of Project likelihood of jurisdictional disputes has been minimized, and <br /> delivery. The Construction Manager shall provide (4) proper coordination has been provided for phased <br /> recommendations on relative feasibility of construction construction. <br /> methods,availability of materials and labor, time requirements <br /> for procurement, installation and.construction, and factors 2.2.11 The Construction Manager shall prepare a Project <br /> related to construction cost including, but not limited to,costs construction schedule providing for the components of the <br /> of alternative designs or materials, preliminary budgets, and Work, including phasing of construction, times of, <br /> possible economies. commencement and completion required of each Contractor, <br /> ordering and delivery of products requiring long lead time,and <br /> 2.2.5 The Construction Manager shall prepare and the occupancy requirements of the Owner. The Construction <br /> periodically update a Project Schedule for the Architect's review Manager shall provide the current Project construction <br /> and the Owner's acceptance. The Construction Manager shall schedule for each set of bidding documents. <br /> obtain the Architect's approval for the portion of the <br /> preliminary project schedule relating to the performance of the 2.2.12 The Construction Manager shall expedite and <br /> Architect's services. In the Project Schedule, the Construction coordinate the ordering and delivery of materials requiring long <br /> Manager shall coordinate and integrate the Construction lead time. <br /> O 199T-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W.,WASHINGTON, D.C. 20006-5292.AIA DOCUMENT B80/CMa <br /> - OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 EDITION -AIAO -WARNING: Unlicensed photocopying violates U.S. copyright laws and <br /> will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in <br /> accordance with your license without violation until the date of expiration as noted below. User Document: b801cmastanthony.aia--5/10/2002.AIA <br /> License Number 1005364, which expires on 1/31/2003. <br /> Electronic Format B801/CMa•1992 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.