Laserfiche WebLink
p reports to the Owner and Architect including Architect and Contractors. Consent shall not be unr_a,., �:� <br /> P ro P . <br /> progress re <br /> information on each Contractor and each Contractor's Work, withheld. <br /> as well as the entire Project, showing percentages of - <br /> completion. The Construction Manager shall keep a daily log ARTICLE 3 <br /> containing a record of weather,each Contractor's Work on the ADDITIONAL SERVICES <br /> site, number of workers; identification of equipment, Work <br /> accomplished, problems encountered, and other similar 3.1 GENERAL <br /> relevant data as the Owner may require. 3.1.1 The services described in this Article 3 are not <br /> 2.3.22 The Construction Manager shall maintain at the included in Basic Services unless so identified in Article 14,and <br /> Project site for the Owner one record copy of all'Contracts, they shall be paid for by the Owner as provided in this <br /> Drawings, Specifications, addenda, Change Orders and other Agreement, in addition to the compensation for Basic Services. <br /> Modifications, in good order and marked currently to record The Optional Additional Services described under Paragraph <br /> changes and selections made during construction, and in 3.3 shall only be provided if authorized or confirmed in writing <br /> addition,approved Shop Drawings, Product Data,Samples and by the Owner. If services described under Contingent <br /> similar required submittals. The Construction Manager.shall Additional Services in Paragraph 3.2 are required due to <br /> maintain records, in,duplicate, of principal building layout circumstances beyond the Construction Manager's control, the <br /> lines, elevations of the bottom of footings, floor levels and key Construction Manager shall notify the Owner prior to <br /> site elevations certified by a qualified surveyor or professional commencing such services. If the Owner deems that such <br /> engineer. The Construction Manager shall make all such' services described under Paragraph 3.2 are not required, the <br /> records available to the Architect and upon completion of the Owner shall give prompt written notice to the Construction <br /> Project shall deliver them to the Owner. Manager. If the Owner indicates in writing that all or part of <br /> such Contingent Additional Services are not required, the <br /> 2.3.23 The Construction Manager shall arrange for the Construction Manager shall have no obligation to provide <br /> delivery, storage, protection and security of Owner-purchased those services. <br /> materials,systems and equipment that are a part of the Project <br /> until such items are incorporated into the Project. 3.2 CONTINGENT ADDITIONAL SERVICES <br /> 2.3.24 With the Architect and the Owner's maintenance 3.2.1 Providing services required because of significant <br /> personnel, the Construction Manager shall observe the changes in the Project including,but not limited to,changes in <br /> Contractors' final testing and start-up of utilities, operational size,quality,complexity or the Owner's schedule. <br /> systems and equipment. 3,2,2 Providing consultation concerning replacement of <br /> 2.3.25 When the Construction Manager considers each Work damaged by fire or other cause during construction, and <br /> Contractor's Work or a designated portion thereof substantially furnishing services required in connection with the <br /> complete, the Construction Manager shall, jointly with the replacement of such Work. <br /> Contractor, prepare for the Architect a list of incomplete or 3.2.3 Providing services made necessary by the termination <br /> unsatisfactory items and a schedule for their completion. The <br /> Construction Manager shall assist the Architect in conducting or default of the Architect or a Contractor, by major defects or <br /> inspections to determine whether the Work or designated deficiencies in the Work of a Contractor, or by failure of <br /> portion thereof is substantially complete. performance of either the Owner or Contractor under a <br /> Contract for Construction. <br /> 2.3.26 The Construction Manager shall coordinate the <br /> correction and completion of the Work. Following issuance of 3.2.4 Providing services in evaluating an extensive number <br /> with the Work. <br /> a Certificate of Substantial Completion of the Work or a w claims submitted by a Contractor or others in connection <br /> designated portion thereof, the Construction Manager shall w <br /> evaluate the completion of the Work of the Contractors and 3.2.5 Providing services in connection with a public <br /> make recommendations to the Architect when Work is ready hearing, arbitration proceeding or legal proceeding except <br /> for final inspection. The Construction Manager shall assist the where the Construction Manager is party thereto. <br /> Architect in conducting final inspections. <br /> 2.3.27 The Construction Manager shall secure and transmit 3.3 OPTIONAL ADDITIONAL SERVICES <br /> to the Architect warranties and similar submittals required by 3.3.1 Providing services relative to future facilities, systems <br /> the Contract Documents for delivery to the Owner and deliver and equipment. <br /> all keys, manuals, record drawings and maintenance stocks to <br /> the Owner. The Construction Manager shall forward to the 3.3.2 Providing services to investigate existing conditions or <br /> Architect a final Project Application for Payment upon facilities or to provide measured drawings thereof. <br /> compliance with the requirements of the Contract Documents. <br /> 3.3.3 Providing services to verify the accuracy of drawings <br /> 2.3.28 Duties, responsibilities and limitations of authority of or other information furnished by the Owner. <br /> the Construction Manager as set forth in the Contract <br /> Documents shall not be restricted, modified or extended <br /> without written consent of the Owner, Construction Manager, <br /> © 1992-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W.,WASHINGTON, D.C. 20006-5292.AIA DOCUMENT 8801/CMa <br /> -OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 EDITION -AIAO -WARNING: Unlicensed photocopying violates U.S. copyright laws and <br /> will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in <br /> accordance with your license without violation until the date of expiration as noted below. User Document: b801cmastanthony.aia--5/10/2002.AIA <br /> License Number 1005364,which expires on 1/31/2003. <br /> Electronic Format 6801/CMa-1992 <br /> 5 <br />