<br /> records 'on authorized Work performed under unit costs, Manager shall have authority, upon written authorizatiOii
<br /> additional Work performed on the basis of actual costs of labor the Owner, to require additional inspection or testing of the
<br /> and materials,and other Work requiring accounting records. Work in accordance with the provisions of the Contract
<br /> Documents, whether or not such Work:is fabricated, installed
<br /> 2.3.11 The Construction Manager shall develop and or completed. The Construction Manager, in consultation with
<br /> implement procedures for the review and processing of the Architect, may reject Work which does not conform to the
<br /> applications by Contractors for progress and final payments. requirements of the Contract Documents.
<br /> 2.3.11.1 Based on the Construction Manager's observations 2.3.14 The Construction Manager shall schedule and
<br /> and evaluations of each Contractor's Application for Payment, coordinate the sequence of construction in accordance with the
<br /> the Construction Manager shall review and certify the amounts Contract Document's and the latest approved Project
<br /> due the respective Contractors. construction schedule.
<br /> 2.3.11.2 The Construction Manager shall prepare a Project 2.3.15 With respect to each Contractor's own Work, the
<br /> Application for Payment based on the Contractors'Certificates Construction Manager shall not have control over or charge of
<br /> for Payment. and shall not be responsible for construction means, methods,
<br /> 2.3.11.3 The Construction Manager's certification for techniques, sequences or procedures, or for safety precautions
<br /> and programs in connection with the Work of each of the
<br /> payment shall constitute a representation to the Owner, based Contractors, since these are solely the Contractor's
<br /> on the Construction Manager's determinations at the site as responsibility- under the Contract for Construction. The
<br /> provided in Subparagraph 2.3.13 and on the data comprising the Construction Manager shall not be responsible for a
<br /> Contractors' Applications for Payment, that, to the best of the Contractor's failure to carry out the Work in accordance with
<br /> Construction Manager's knowledge,information and belief,the the respective Contract Documents. The Construction
<br /> Work has progressed to the point indicated and the quality of Manager shall not have control over or charge of acts or
<br /> the Work is in accordance with the Contract Documents. The omissions of the Contractors,Subcontractors,or their agents or
<br /> foregoing representations are subject to an evaluation of the employees, or any other persons performing portions of the
<br /> Work for conformance with the Contract Documents upon Work not directly employed by the Construction Manager.
<br /> Substantial Completion, to results of subsequent tests and
<br /> inspections,to minor deviations from the Contract Documents 2.3.16 The Construction Manager shall transmit to the
<br /> correctable prior to completion and to specific qualifications Architect requests for interpretations of the meaning and intent
<br /> expressed by the Construction Manager. The issuance of a of the Drawings and Specifications, and assist in the resolution
<br /> Certificate for Payment shall further constitute a representation of questions that may arise.
<br /> that the Contractor is entitled to payment in the amount
<br /> certified. 2.3.17 The Construction Manager shall review requests for
<br /> changes, assist in negotiating Contractors' proposals, submit
<br /> 2.3.11.4 The issuance of a Certificate for Payment shall not recommendations to the Architect and Owner, and, if they are
<br /> be a representation that the Construction Manager has (1) accepted, prepare Change Orders and Construction Change
<br /> made exhaustive or continuous on-site inspections.to check the Directives which incorporate the Architect's modifications to
<br /> quality or quantity of the Work, (2) reviewed construction the Documents.
<br /> means, methods, techniques, sequences for the Contractor's
<br /> own Work, or procedures, (3) reviewed copies of requisitions 2.3.18 The Construction Manager shall assist the Architect in
<br /> received from Subcontractors and material suppliers and other the review,evaluation and documentation of Claims.
<br /> data requested by the Owner to substantiate the Contractor's
<br /> right to payment or (4) ascertained how or for what purpose 2.3:19 The Construction Manager shall receive certificates of
<br /> the Contractor has used money previously paid on account of insurance from the Contractors and forward them to the
<br /> the Contract Sum. Owner with a copy to-the Architect.
<br /> 2.3.12 The Construction Manager shall review the safety 2.3.20 In collaboration with the Architect, the Construction
<br /> programs developed by each of the Contractors for purposes of Manager shall establish and implement procedures for
<br /> coordinating the safety programs with those of the other expediting the processing and approval of Shop Drawings,
<br /> Contractors. The Construction Manager's responsibilities for Product Data, Samples and other submittals. The Construction
<br /> coordination of safety programs shall not extend to direct Manager shall review all Shop Drawings, Product Data,
<br /> control over or charge of the acts or omissions of the Samples and other submittals from the Contractors. The
<br /> Contractors, Subcontractors, agents or employees of the Construction Manager shall coordinate submittals with
<br /> Contractors or Subcontractors, or any other persons information contained in related documents and transmit to
<br /> performing portions of the Work and not directly employed by the Architect those which have been approved by the
<br /> the Construction Manager. Construction Manager. The Construction Manager's actions
<br /> shall be taken with such reasonable promptness as to cause no
<br /> 2.3.13 The Construction Manager shall determine in general delay in the Work or in the activities of the Owner or
<br /> that the Work of each Contractor is being performed in Contractors.
<br /> accordance with the requirements of the Contract Documents,
<br /> endeavoring to guard the Owner against defects and 2.3.21 The Construction Manager shall record the progress
<br /> deficiencies in the Work. As appropriate, the Construction of the Project. The Construction Manager shall submit written
<br /> © 1992-THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W.,WASHINGTON, D.C. 20006-5292.AIA DOCUMENT 6801/CMa
<br /> -OWNER-CONSTRUCTION MANAGER AGREEMENT - 1992 EDITION -AIA® -WARNING: Unlicensed photocopying violates U.S. copyright laws and
<br /> will subject the violator to legal prosecution. This document was electronically produced with permission of the AIA and can be reproduced in
<br /> accordance with your license without violation until the date of expiration as noted below. User Document: b801cmastanthony.aia--5/10/2002.AIA
<br /> License Number 1005364,which expires on 1/31/2003.
<br /> Electronic Format 6801lCMa-1992