My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 07232002
StAnthony
>
City Council
>
City Council Packets
>
2002
>
CC PACKET 07232002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:57:48 PM
Creation date
12/30/2015 7:57:37 PM
Metadata
Fields
SP Box #
29
SP Folder Name
CC PACKETS 2001-2004
SP Name
CC PACKET 07232002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 2003 Street& Utility Construction Project Opinion of Probable Cost <br /> City of St. Anthony,MN <br /> ' Schedule B - Sanitary Sewer <br /> Item No. Description Quantity Unit Unit Cost Total <br /> ' 1 Remove Sewer Pipe(Sanitary) 2,760 LF $4.00 $11,040.00 <br /> 2 Remove.Sanitary Sewer Service 44 Each $110.00 $4,840.00 <br /> 3 Remove Manholes 14 Each $308.00 $4,312.00 <br /> ' 4 Salvage.Castings 14 Each $115.00 $1,610.00 <br /> 5 Granular Foundation and/or Bedding 1,330 CY $20.00 $26,600.00 <br /> ' 6 Sanitary Sewer Bypass Pumping 1 Lump Sum $15,000.00 $15,000.00 <br /> 7 Connect to Existing Sanitary Sewer 5 Each $1,200.00 $6,000.00 <br /> 8 Reconnect to Existing Sanitary Sewer Service 44 Each $190.00 $8,360.00 <br /> ' 9 10"x 6" PVC Wye 44 Each $120.00 $5,280.00 <br /> 10 Manhole Chimney'Seals 14 Each $310.00 $4,340.00 <br /> 11 6" PVC Pipe Sewer SDR 26 1,452 LF $25.00 $36,300.00 <br /> ' 12 10" PVC Pipe Sewer SDR 35 2,760 LF $38.00 $104,880.00 <br /> 13 Sanitary Sewer Inspection 2,760 LF $1.25 $3,450.00 <br /> 14 Casting Assembly 14 Each $375.00 $5,250.00 <br /> t 15 Construct Sanitary Manholes 168 LF $165.00 $27,720.00 <br /> 16 Spot Repair of Fractured 9"VCP Pipe 3 Each L $500.00 $1,500.00 <br /> 17 Slip-line 9" VCP 304 LF $45.00 $13,680.00 <br /> Subtotal $280,162.00 <br /> ' +10% Contingencies $28,016.00 <br /> Subtotal $308,178.00 <br /> +30%Administrative $92,453.00 <br /> ' Grand Totall $400,630.00 <br /> 1 <br /> [Date]2003 Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.