Laserfiche WebLink
' 12003 Street & Utility Construction Project Opinion of Proabable Cost <br /> City of St. Anthony,MN <br /> Schedule C - Watermain <br /> Item No. Description Quantity Unit Unit Cost Total <br /> ' 1 Remove Watermain(All Sizes) 3,590 LF $5.00 $17,950.00 <br /> 2 Remove Valve&Box 6 Each $75.00 $450.00 <br /> 3 Remove Water Service and Curb Box 62 Each $100.00 $6,200.00 <br /> ' 4 Salvage Hydrant 7 Each $460.00 $3,220.00 <br /> 5 Temporary Water Service 1 Lump Sum $15,000.00 $15,000.00 <br /> 6 8" Gate Valve and Box 4 Each $800.00 $3,200.00 <br /> ' 7 10" Gate Valve and Box 3 Each $1,450.00 $4,350.00 <br /> 8 Connect to Existing Watermain 7 Each $840.00 $5,880.00 <br /> ' 9 Connect to Existing Water Service 62 Each $195.00 $12,090.00 <br /> 10 1" Corporation Stop 62 Each $70.00 $4,340.00 <br /> 11 V Curb Stop and Box 62 Each $120.00 $7,440.00 <br /> ' 12 Hydrant Assembly 7 Each $2,550.00 $17,850.00 <br /> 13 1"Type K Copper Pipe 2,046 LF $20.00 $40,920.00 <br /> 14 8" Water Main,DIP CL 52 W/Poly Wrap 1,500 LF $26.00 $39,000.00 <br /> ' 15 10"Water Main,DIP CL 52 W/Poly Wrap 2,090 LF $32.00 -$66,880.00 <br /> 16 4" Polstyrene Insulation 18 SY $22.00 $396.00 <br /> 17 Ductile Iron Fittings 4,140 LB $2.50 $10,350.00 <br /> Subtotal $255,516.00 <br /> 1 +10% Contingencies $25,552.00 <br /> Subtotal $281,068.00 <br /> +30%Administrative $84,320.00 <br /> ' Grand Totall $365,390.00 <br /> 1 <br /> ' <br /> [Date]2003 <br /> Schedule <br />