Laserfiche WebLink
1. EXECUTIVE SUMMARY <br /> This project has been entitled the 2003 Street and Utility Improvement Project. This <br /> ' project provides for the street and utility reconstruction on 34`h Avenue NE from Stinson <br /> Boulevard to Silver Lake Road, Belden Drive from 33`d Avenue NE to 34`h Avenue NE, <br /> and Edward Street from 33`d Avenue NE to 34`h Avenue NE. <br /> This Feasibility Report outlines the proposed reconstruction of approximately 4,060 feet <br /> of 30-foot(30') urban section streets, complete with bituminous paving and concrete curb <br /> ' and gutter. Also proposed is the replacement of approximately 3,600 feet of water main, <br /> and 2,760 feet of sanitary sewer main, and approximately 62 water services. The <br /> installation of new storm sewer catch basins is also proposed. <br /> A total estimated project cost is $1,736,200. Funding for the project will come from the <br /> City's street and utility reconstruction funds and special assessments. <br /> The project reconstruction can be completed, including the first lift of bituminous and all <br /> restoration items, in 2003 The final lift of bituminous is proposed to be installed in <br /> 2004. <br /> This project is feasible, necessary, and cost effective from an engineering standpoint and <br /> should be constructed as proposed herein. <br /> City of St Anthony- 2003 Street and Utility Improvement Project <br /> ' Feasibility Report <br /> WSB Project No. 1065-71 Page 1 <br />