Laserfiche WebLink
' 2. INTRODUCTION <br /> 2.1. Authorization <br /> On May 28, 2002 the City of St. Anthony City Council authorized the preparation of an <br /> ' engineering Feasibility Report for the 2003 Street and Utility Improvement Project. This <br /> project was authorized under City of St. Anthony Resolution 02-050. <br /> ' 2.2. Scope <br /> This project provides for the street and utility reconstruction on 34`h Avenue NE from <br /> Stinson Boulevard to Silver Lake Road, Belden Drive from 33rd Avenue NE to.34`h <br /> Avenue NE, and Edward Street from 33rd Avenue NE to 34`h Avenue NE. <br /> ' In summary, street, sanitary sewer, water main and storm sewer improvements are all <br /> proposed as part of this project. <br /> 1 - <br /> 2.3. Data Available <br /> Information and materials used in the preparation of this report include the following: <br /> • City of St. Anthony Record Drawings <br /> • City of St. Anthony Topographic Maps <br /> • Interviews and discussion with property owners' <br /> • Field observations of area <br /> • Televising reports of the sanitary sewer system <br /> 2.4. Project Location <br /> 1 The.project is located in the west central portion of the City of St. Anthony and includes <br /> the following streets: <br /> • 34`h Avenue NE, between Stinson Boulevard and Silver Lake Road <br /> ', • Belden Drive, between 33rd Avenue NE and 34`h Avenue NE <br /> • Edward Street NE, between 33rd Avenue NE and 34`h Avenue NE <br /> The project area is identified'on Figure 1 in Appendix A of this report. <br /> 2.5. Project History <br /> This project was initiated through the recognition of the following conditions in the <br /> project area: <br /> City of St. Anthony-2003 Street and Utility Improvement Project <br /> ' Feasibility Report <br /> WSB Project No. 1065-71 Page 2 <br />