My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 11151988
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1983
>
PL PACKET 11151988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 12:07:20 PM
Creation date
12/30/2015 3:29:45 PM
Metadata
Fields
SP Box #
15
SP Folder Name
PL PACKETS 1983
SP Name
PL PACKET 01181983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*at the most, the acquisition will take 120 days after which <br /> construction can start; <br /> *construction time period would be between 18 and 22 months with the <br /> entire project to be completed within that time; <br /> *the developers will begin renting each building as it is completed. <br /> The Commissioners were told that the next critical event would be in 37 <br /> days when (if) the bonds are sold and the acquisition process can be <br /> started. <br /> It appeared that the neighbors' concerns had been satisfactorily <br /> addressed and when no one else requested to speak, the Chair closed the <br /> hearing at 8:10 P.M. <br /> Commission Recommendation <br /> Motion by Madden, seconded by Brownell to recommend the City Council <br /> approve the amending to the Development Concept Plan and the Detail Plan <br /> for Phase 3 of the Kenzie Terrace Redevelopment Project as proposed by <br /> Lang-Nelson and in .accordance with the Site Plan and Preliminary <br /> Landscaping and Utility Plans developed by Pope Associates and printed <br /> August 9, 1988. This amendment will allow the construction of three <br /> buildings of three stories each over underground parking on the site <br /> currently occupied by the St. Anthony Village Shopping Center and an <br /> unused triangular parcel of land on the west side of the Town and <br /> Country Foods Store property. Said buildings will consist of two <br /> apartment buildings for senior rental only, with Building B to contain • <br /> 48 units and Building A, 57 units. The third structure, Building C, <br /> will contain 96 high quality market rate rental units. The amendment <br /> would also allow building heights of 43 feet from grade to highest peak <br /> level, where 42 feet had previously been approved and the P.U.d. <br /> Ordinance only allows 35 feet heights. The Planning Commission <br /> recommends approval be also made subject to: <br /> *provision of 206 underground and 153 surface parking spaces on the <br /> site; <br /> *ponding for aesthetic and storm drainage purposes as indicated on the <br /> Site Plan; <br /> .*brick exteriors with wood accents around the balconies or extended <br /> living room areas; <br /> *a peak rather than flat roof design; <br /> *no vehicle access from Lowry Avenue; <br /> *landscaping, vegetation, and bermed screening as shown in the <br /> Preliminary Landscaping Plan; <br /> 6 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.