Laserfiche WebLink
on an adjacent parcel. We've discovered demand for condominium and one-level <br /> townhomc units in Roseville and surrounding communities.Many individuals are moving <br /> from their single Gamily homes and are seeking dwellings requiring lower maintenance, <br /> but still offering the same kind of amenities and spaces found in single family homes. <br /> The plan attached to this application indicates grading and drainage for the site. The <br /> topography is relatively flat, dropping about three feet from the west end to the east end. <br /> The site will be graded to drain to the east to a newly created detention pond on the <br /> condominium site. The construction of the proposed townhome development will <br /> necessitate the removal of the asphalt currently covering the parcel. In the end, less <br /> impervious surface will be present on the site, creating less run-off than is present today. <br /> Landscaping of the site will include sod and appropriate planting of trees and shrubs. A <br /> landscape plan is forthcoming. <br /> We believe the proposal before you,for the construction of twelve townhomes,will have <br /> minimal impact on the surrounding area and community. One-level townhomes will.not <br /> impose visually on the existing homes to the north or the three-story condominium <br /> structure to the south. The surrounding area will experience a minimal increase in traffic, <br /> but will also see the removal of a large and unsightly asphalt surface and the construction <br /> of housing that is in demand in Roseville and St. Anthony. <br /> In short,we feel twelve townhomes constructed on this large site represent an appropriate <br /> and feasible use of the land that is consistent with the Roseville Comprehensive Plan and <br /> the existing use of surrounding land. <br /> Please contact me with questions or concerns, <br /> Sincerely, <br /> Crin'L-. Mathern <br /> for Mendota Homes, Inc. <br /> £0 'd r6Z£889 t£W*, 'Z89!i3£9 Wd rZ: ZO NOW 66-01-A1Z1W <br />