My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04271982
StAnthony
>
City Council
>
City Council Packets
>
1982
>
CC PACKET 04271982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:46:59 PM
Creation date
12/30/2015 3:46:46 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 04271982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> DATE: April 20 , 1982 <br /> • TO: Dave Childs , City Manager <br /> FROM: Larry Hamer, Public Works Director <br /> SUBJECT: Well 44 Progress Report <br /> --------------------------------------------------------------- <br /> Well #4 was pulled the week of April 1 , 1982 . There was a considerable <br /> amount of corrosion on the column pipe and pump shafts . In the past, <br /> the lower 65 feet of column and shafting (.which is in the water) cor- <br /> rodes to a very large degree. When the well was pulled 5 years ago, <br /> the City had to .replace this 65 feet of column and shaft. Fifteen <br /> feet of, the shafting replaced 5 years .ago was stainless steel and <br /> shows no signs of corrosion. <br /> (.1) The well was measured and it was found that there is about 12 feet <br /> of fill present. This would amount to about a yard of fill and is <br /> not an appreciable amount at this time , removal of fill should be <br /> planned for the next time the pump is pulled. <br /> (2) The shafting appears to be in good condition , with the exception <br /> of the bottom 50 feet. If this shaft is replaced with steel, as <br /> we have in the past , the cost will be $835 . 50 . Installation of <br /> 50 feet of stainless steel shafting with couplings would cost <br /> $1 , 854 . 00 , but would not be subject to corrosion. In other words , <br /> installing with stainless steel would mean an additional $1,012 .50 <br /> over and above the $835. 50 for steel, but would have a nearly <br /> unlimited life expectancy. <br /> RECOMMENDATION <br /> Recommend a change order to install stainless steel shafting in the <br /> bottom 50 feet of Well #4 to prevent frequent replacement. - <br /> (3) The column pipe was inspected on the site by a Layne Minnesota <br /> representative and myself. The only section appearing to need <br /> replacement at that time was the tail piece. After Layne removed <br /> the column pipe from the location site to sandblast and recoat <br /> it, I received a call from them informing me they found 18 ten foot <br /> sections needing replacement. I then inspected the column my- <br /> self and confirmed the deficiencies . The cost of the 18 ten <br /> foot sections ,o s , with couplings , amounts to $4 , 518.00 . <br /> RECOMMENDATION <br /> Recommend a change order to replace the column pipe (couplings included) <br /> for $4 , 518. 00 . <br /> Total repair costs with both change orders approved* $13 ,262 . 50 <br /> • Total Repair costs without stainless steel shafting $ 7 ,727 . 50 <br /> and without replacement of 18 sections of column pipe <br /> and couplings* <br /> *less motor cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.