Laserfiche WebLink
wI • <br /> City of Saint Anthony December 1, 1983 <br /> Saint Anthony, Mn. • <br /> Re: File No. 205 <br /> the potential amount of water that would be available to Saint Anthony. The <br /> Study would not include a detailed computer analysis of either Saint Anthony's <br /> or Roseville's water system. Such an analysis will be required prior to fin- <br /> alizing an agreement regarding a water system interconnection. The estimated <br /> manhours and cost of the Study are as summarized in the following table: <br /> COST ESTIMATE <br /> ROSEVILLE CONNECTION STUDY <br /> Personnel Description Hours Hourly Rate Totals <br /> Principal Engineer 4 $45.00 $ 180.00 <br /> Registered Engineer 55 $40.75 2,241.25 <br /> Senior Technician 20 $27.00 540.00 <br /> Clerical 10 $20.00 200.00 <br /> Sub-Total $3,161.25 <br /> Printing 100.00 <br /> TOTAL $3,261.25 <br /> We propose to complete the. Roseville Connection Study for a total cost not to <br /> exceed $3,250.00. We look forward to working with the City of Saint Anthony • <br /> on this Study. <br /> Respectfully submitted, <br /> BONESTR00, ROSENE, ANDERLIK & ASSOCIATES, INC. <br /> Joseph C. Anderlik <br /> JCA:li <br /> Page 2. • <br /> 8319b <br />