My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 11131990
StAnthony
>
City Council
>
City Council Packets
>
1990
>
CC PACKET 11131990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:09:28 PM
Creation date
12/30/2015 8:09:17 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 11131990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Paul G. Brewer • <br /> October 24, 1990 <br /> Page #2 <br /> I believe a chronological order of events justifying the extra <br /> services. noted on Invoice No. 8571 would be in order. We began <br /> preparation of plans and specifications in late November, 1989. <br /> We submitted preliminary plans and traffic control specifications <br /> to Mr. Larry Hamer, Director of Public Works, City of St. <br /> Anthony, for his review -and approval on December 12, 1989. Final <br /> plans and specifications and a copy of the Hennepin County Permit <br /> Application were submitted to Mr. Hamer on January 16, 1990. On <br /> this same date, the permit application and plans and specifica- <br /> tions were submitted to Mr. Dave Zetterstrom of the Hennepin <br /> County Highway Division traffic office and Mr. Paul Brewer. We <br /> also submitted an engineer's estimate to you on that same date. <br /> At the end of January, you questioned the need for the left turn <br /> in the median for a future driveway on the north side. On April <br /> 16, 1990, we were contacted by Mr. Dave Zetterstrom and informed <br /> that the left turn lane for eastbound would be deleted, the <br /> westerly median would .be lengthened plus or minus ten feet to the <br /> east or to the nearest joint, approximately Station 3+90. We <br /> were to remove two driveways on the eastbound Kenzie Terrace <br /> south side, Station 5+00 to Station 6+00. We were to -make • <br /> revisions on the plans and specifications and resubmit a permit. <br /> These revisions are indicated as a part of the extra services on <br /> Invoice No. 8571. Additional extra services involved site visits <br /> during construction by the project manager to discuss additional <br /> requirements imposed by Hennepin County after the existing <br /> pavement edge was exposed. I will address these items later. <br /> On April 23, 1990, we received a request from Mr. Brewer to <br /> switch back from City participation and administration of the <br /> project to the participation and administration by La Nei <br /> Financial Group, Inc. This required a slight change in the <br /> specifications which appears as extra services on Invoice No. <br /> 8571. <br /> The revised plans were submitted to the City, La Nei Group and <br /> Hennepin County on May 10, 1990. In addition, a revised <br /> engineer' s estimate was submitted to Mr. Brewer for his infor- <br /> mation. <br /> SEH followed the as-constructed plans as provided by Hennepin <br /> County for design of the revisions to the median section and <br /> pavement reconstruction adjacent to the median. The information <br /> submitted to SEH by Hennepin County did not indicate any <br /> requirement for drilling and placing reinforcement steel in the <br /> edge of the existing pavement. After the undersigned met with <br /> Mr. Brewer's contractor, Mr. Pete Donino, representing the prime • <br /> contractor on the project, it was discovered that the large <br /> portion of the existing pavement already had a keyway inplace. We <br />
The URL can be used to link to this page
Your browser does not support the video tag.