My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12131993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 12131993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:27:17 PM
Creation date
12/30/2015 8:27:06 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 12131993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAY ESTIMATE <br /> i3 <br /> FROM: OCTOBER 30, 1993 <br /> TO: NOVEMBER 24, 1993 <br /> CONTRACTOR: PROGRESSIVE CONTRACTORS, INC. <br /> • ADDRESS: 8736 ZACHARY LANE,OSSEO. MN 55369 <br /> OWNER: CITY OF ST.ANTHONY,MINNESOTA <br /> PROJECT: 37TH AVENUE CONCRETE STREET REHABILITATION <br /> COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL: November 13, 1993 ORIGINAL: $ 241,179.50 <br /> REVISED: REVISED: S <br /> CONTRACT ITEMS. THIS PERIOD TOTAL TO DATE <br /> ITEM.: ITEM DESCRIPTION <br /> NO. : .'. NIT.. <br /> : QTY UNIT:. QTY UNIT;:: QTY UNIT <br /> pRICE-.: PRICE.. PRICE <br /> d.SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS <br /> 1 MOBILIZATION LS 1 $28,700.00 0.0 $0.00 1.0 $28,700.00 <br /> 2 REMOVE CONC. CURB &GUTTER LF 20 $7.00 0 $0.00 19 $133.00 <br /> 3 88 CONCRETE CURB LF 20 $15.00 0 $0.00 19 $285.00 <br /> 4 CL. 5 AGG. ( 100% CRSHD LIMESTNE) TON 500 $10.00 0 $0.00 0 $0.00 <br /> 5 CONCRETE PAVEMENT PLANING SY 10500 $3.75 0 $0.00 9387 $35,201.25 <br /> 6 SEAL CONCRETE PAVEMENT(3723) LB. 1250 $3:00 550 $1,850.00 1450 $4,350.00 <br /> 7 SEAL CONCRETE PAVMNT(SILICONE) LB. 900 $7.50 780.5 $5,853.75 1142.5 $8,568.75 <br /> 8 1/2'JOINT REPAIR(TYPE A-1 MOD) LF 6000 $1.00 2980 $2,980.00 5452 $5,452.00 <br /> 9 1/2' LONGITDNL.JNT. TRP. (TYPE A-5) LF 11500 $0.80 4160 $2,498.00 10400 $8,240.00 <br /> 10 CRACK REPAIR(TYPE A-3) LF 250 $1.50 223 $334.50 271 $406.50 <br /> 11 SPOT SURFACE REPAIR(TYPE B-2A) SF 540 $15.00 0 $0.00 519 $7,785.00 <br /> 12 SURFACE REPAIR(TYPE B-2B) (>30SF) SF 180 $10.00 0.0 $0.00 8.4 $84.00 <br /> 13 SPOT FULL DEPTH REPAIR(TYPE C-1) SF 655 $23.00 354.4 $8,151.20 584.4 $13,441.20 <br /> 14 CONCRETE PAVEMENT(TYPE D) SY 1700 $35.00 0 $0.00 1884 $58,940.00 <br /> 15 NO.8 REINFORCEMENT BARS LB. 6800 $1.50 0 $0.00 8092 $9,138.00 <br /> 18 F&I NEEHNAH R-3250-1 CASTING ASSMBL EA 1 $400.00 1 $400.00 2 $800.00 <br /> TRAFFIC CONTROL LS 1 $10,000.00 0.0 $0.00 1.0 $10,000.00 <br /> ADJUST M.H. CASTING EA 17 $150.00 0 $0.00 8 $1,200.00 <br /> 9 ADJUST C.B. CASTING EA 7 $175.00 0 $0.00 2 $350.00 <br /> 20 PAVEMENT MARKINGS LS 1 $1,100.00 1 $1,100.00 1 $1,100.00 <br /> T SCHEDULE 1.0 37TH AVE NE IMPROVEMENTS-Total $22,965.45 $190,154.70 <br /> SCHEDULE 2.0 SIDEWALK CONSTRUCTION <br /> 1 REMOVE CONC. CURB & GUTTER LF 28 $8.00 0 $0.00 25 $150.00 <br /> 2 CL. 5 AGO. (100% CRSHD LIMESTONE) TON 240 $12.00 11.04 $132.48 204.04 $2,448.48 <br /> 3 4'THICK CONCRETE SIDEWALK SF 10990 $1.80 -85 ($138.00) 9915 $15,864.00 <br /> 4 8'THICK CONCRETE SIDEWALK SF 1000 $2.15 880 $1,482.00 880 $1,462.00 <br /> 5 PEDESTRIAN RAMP EA 2 $300.00 0 $0.00 2 $600.00 <br /> 8 REMOVE ASPHALT PAVEMENT SY 75 $8.00 130 $780.00 205 $1,230.00 <br /> 7 REMOVE CONCRETE PAVEMENT SY 85 $12.00 58.5 $878.00 78.5 $942.00 <br /> 8 2' BIT. DRIVEWAY RESTORATION SY 75 $12.00 136 $1,832.00 138 $1,832.00 <br /> 9 CLEARING &GRUBBING TREES LS 1 $1,500.00 0 $0.00 1 $1,500.00 <br /> 10 ADJUST M.H. CASTING EA 7 $180.00 0 $0.00 2 $320.00 <br /> 11 SELECT TOPSOIL BORROW CY 160 $10.00 0 $0.00 0 $0.00 <br /> 12 SOD, LAWN& BOULEVARD TYPE SY 2850 $1.95 0 $0.00 0 $0.00 <br /> 13 B8 CONCRETE CURB LF 28 $15.00 -3 ($45.00) 25 $375.00 <br /> T SCHEDULE 2.0 SIDEWALK CONSTRUCTION-Total $4,503.48 $26,523.48 <br /> SCHEDULE 3.0 HENNEPIN CO. WORK-ADDED <br /> 1 TRAFFIC CONTROL LS 1 $1,018.80 0.5 $508.30 0.5 $508.30 <br /> 2 CONCRETE PAVEMENT(TYPE D) SY 143 $35.00 0.0 $0.00 0.0 $0.00 <br /> T SCHEDULE 3.0 HENNEPIN COUNTY WORK ADDED-Total $508.30 $508.30 <br /> is TOTAL THIS PERIOD $27,977.23 <br /> TOTAL TO DATE $217,186.48 <br /> 490018.No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.