My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 12131993
StAnthony
>
City Council
>
City Council Packets
>
1993
>
CC PACKET 12131993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:27:17 PM
Creation date
12/30/2015 8:27:06 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 12131993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SCHEDULE SUMMARY <br /> DESCRIPTION TOTAL/PERIOD TOTAL/TODATE <br /> SCHEDULE 1.0 37TH AVE NE $22,965.45 $190,154.70 <br /> SCHEDULE 2.0 SIDEWALK CONSTR. $4,503.48 $26,523.48 <br /> SCHEDULE 3.0 HENN. CO. WORK $508.30 $508.30 <br /> TOTAL $27,977.23 $217,186.48 <br /> ai <br /> THI$ PERIOD TOTAL TO DATE <br /> AMOUNT EARNED $27,977.23 .: :$217,186 48 <br /> AMOUNT RETAINED _ $1,398.86 $10,859.32 <br /> MATERIAL ON SITE $0.00 $0.00 <br /> MATERIAL DEDUCT. $0.00 $0.00 <br /> PREVIOUS PAYMENTS $0.00 $179,748 79 <br /> AMOUNT DUE $26,578.37 $26,578.37 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.