My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09131994
StAnthony
>
City Council
>
City Council Packets
>
1994
>
CC PACKET 09131994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 6:22:09 PM
Creation date
12/30/2015 6:21:59 PM
Metadata
Fields
SP Box #
22
SP Folder Name
CC PACKETS 1994-1998
SP Name
CC PACKET 09131994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTIAL PAY ESTIMATE <br /> I6 (FINAL) <br /> FROM: MAY 27. 1994 <br /> TO: JUNE 24. 1994 <br /> • CONTRACTOR: W. B.MILLER,INC. <br /> ADDRESS: 16765 NUTRIA STREET,RAMSEY <br /> OWNER: CITY OF ST. ANTHONY,MINNESOTA <br /> PROJECT: 1993 STREET&UTILITY IMPROVEMENTS <br /> COMPLETION DATE AMOUNT OF CONTRACT <br /> ORIGINAL: September 10, 1993 ORIGINAL: 6 492,686.65 <br /> REVISED: September 24, 1993 REVISED: 4 502,518.05 <br /> :.:.; <br /> CONTRACT ITEMS THIS PERIOD TOTAL TO DATE <br /> ITEM ITEM DESCRIPTION <br /> NO <br /> NIT QTY UNIT QTY UNIT" OTY:. UNIT::' <br /> ;..: ,E PRICE : PRICE. <br /> SCHEDULE 1.0 RANKIN ROAD OVERLAY <br /> 1 MILL BITUMINOUS SURFACE SY 3820 $1.00 0 $0.00 3820 $3,820.00 <br /> 2 2331. TYPE 41A BITUMINOUS MIX TON 815 427.00 0 $O.00 815 $18,805.00 <br /> 3 BITUMINOUS TACK COAT GAL 315 41.00 0 $0.00 315 $315.00 <br /> 4 REMOVE CONCRETE CURB&GUTTER LF 24 $4.00 0 $0.00 0 $0.00 <br /> 5 CONCRETE CURB&GUTTER LF 24 $13.00 0 $0.00 0 $0.00 <br /> 6 ADJUST EX. MANHOLE CASTING EA 12 $130.00 0 $0.00 12 $1,580.00 <br /> 7 ADJUST EX. GATE VALVE CASTING EA 2 $90.00 0 $0.00 2 $180.00 <br /> T SCHEDULE 1.0 RANKIN ROAD OVERLAY IMPROVE.-Total $0.00 $22,280.00 <br /> SCHEDULE 2.0 CROFT DRIVE OVERLAY <br /> 1 MILL BITUMINOUS SURFACE SY 780 $1.00 0 $0.00 780 $780.00 <br /> 2 2331. TYPE 41A BITUMINOUS MIX TON 235 $27.00 0 $0.00 235 $6,345.00 <br /> •3 BITUMINOUS TACK COAT GAL 120 $1.00 0 $0.00 120 $120.00 <br /> 4 REMOVE CONCRETE CURB &GUTTER LF 49 $4.00 0 $0.00 0 $0.00 <br /> 5 CONCRETE CURB &GUTTER LF 49 $13.00 0 $0.00 0 $0.00 <br /> 8 ADJUST EX. MANHOLE CASTING EA 2 $130.00 0 $0.00 2 $280.00 <br /> T SCHEDULE 2.0 CROFT DRIVE OVERLAY-Total $0.00 $7,505.00 <br /> SCHEDULE 3.0 31ST AVENUE RECONSTR. <br /> 1 REMOVE CONC.CURB&GUTTER LF 1942 $3.25 0 $0.00 1978 $0,422.00 <br /> 2 ADJUST EX. MANHOLE CASTING EA 7 $130.00 0 $0.00 7 5910.00 <br /> 3 WATER FOR DUST CONTROL MGAL 15 $10.00 0 $0.00 15 $150.00 <br /> 4 COMMON EXCAVATION CY 4239 45.30 0 $0.00 4239 $22,488.70 <br /> 5 SUBGRADE PREPARATION RDSTA 10 $100.00 0 $0.00 10.08 $1,006.00 <br /> 8 GEOTEXTILE FABRIC SY 3870 $1.00 0 $0.00 3870 $3,870.00 <br /> 7 SELECT GRANULAR BORROW(CV) CY 2445 $7.30 0 $0.00 2445 $17,848.50 <br /> 8 4'PERF. (PE) CORR. PIPE DRAIN LF 1942 $3.00 0 $0.00 1942 $5,828.00 <br /> 9 CLASS 5 AGGREGATE BASE TON 1240 $7.30 0 $0.00 1240 $9,052.00 <br /> 10 2331, TYPE 31B BASE MIXTURE TON 410 $24.00 0 $0.00 410 $9,840.00 <br /> 11 2331, TYPE 41A WEAR MIXTURE TON 310 $27.00 0 $0.00 281.47 $7,599.89 <br /> 12 BITUMIOUS TACK COAT GAL 180 $1.00 0 $0.00 160 $160.00 <br /> 13 B818 CONCRETE CURB &GUTER LF 1942 45.20 0 $0.00 1978 $10,275.20 <br /> 14 2'BIT. DRIVEWAY RESTORATON SY 90 $10.00 0 $0.00 90 $900.00 <br /> 15 8'CONCR. DRIVEWAY RESTORATION SY 200'- $22.00 0 $0.00 444 $9,788.00 <br /> 18 SAWCUT CONCRETE LF 250 $3.00 0 $0.00 250 $750.00 <br /> 17 CONCRETE DRIVEWAY APRON SY 110 422.00 0 $0.00 110 $2,420.00 <br /> 18 4'CONCRETE WALK SF 120 $2.50 0 $0.00 120 $300.00 <br /> 19 SELECT TOPSOIL BORROW CY 75 410.00 0 $0.00 75 $750.00 <br /> 20 SOD. LAWN & BOULEVARD TYPE SY 3355 $1.40 0 $0.00 3355 $4,897.00 <br /> 21 SUBGRADE TESTING LS 1 $200.00 0 $0.00 1 $200.00 <br /> 22 GRANULAR BORROW TESTING LS 1 $800.00 0 $0.00 1 5800.00 <br /> 23 CLASS 5 AGGREGATE TESTING LS 1 $300.00 0 $0.00 1 4300.00 <br /> 4 BITUMIOUS PAVEMENT TESTING LS 1 $900.00 0 $0.00 0.5 $450.00 <br /> SCHEDULE 3.0 31ST AVENUE RECONSTR.-Total $0.00 4118,581.09 <br /> 40015.No 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.